Located in:
- III. Operational Planning ElementsThe Unified or Combined State Plan must include an Operational Planning Elements section that support the State’s strategy and the system-wide vision described in Section II.(c) above. Unless otherwise noted, all Operational Planning Elements apply to Combined State Plan partner programs included in the plan as well as to core programs. This section must include—
- b. State Operating Systems and PoliciesThe Unified or Combined State Plan must include a description of the State operating systems and policies that will support the implementation of the State strategy described in Section II Strategic Elements . This includes—
- b. State Operating Systems and Policies
III. b. 4. C. Previous Assessment Results
Current Narrative:
TWC met or exceeded its Program Year 2013 (PY 2013) and PY 2014 performance targets for WIA Title I and Title III Wagner-Peyser programs with one exception. TWC’s PY 2013 WIA Title I Adult Average Earnings performance was only 85.16 percent of target. However, this was largely due a reduction in performance with one of the largest Boards, which TWC and the Board were able to correct with technical assistance.
PY 2013 and PY 2014 were years of transition for the AEL program in Texas. PY 2013 was the first year that TWC was responsible for the program and much of the focus in that first year was on developing and deploying policy and procedures that would transform the statewide system; expand the participation and enjoyment of critical workforce, postsecondary, and community-based stakeholders; and reinforce increased accountability and responsiveness in the system. Bold program objectives embraced transitions and career pathways programs, and generally focused more heavily on ensuring that education led to employment and career development outcomes. TWC immediately reprocured the entire statewide system of grantees and incorporated these expectations and requirements into provider contracts that began in PY 2014. TWC also initiated commensurate contract and program management focused on program accountability and date-driven continuous improvement. While some of the grantees had previously been involved in the program, even they experienced capacity building challenges as well as a programmatic shift in program philosophy toward a vision of delivering educational services for the purpose of college and career transition and outcomes.
The challenges of the transition and program transformation made achieving performance in PY 2013 and PY 2014 very difficult, and the system in fact missed many of the targets. In addition to the challenges posed by the transition, performance on the GED Attainment measure was negatively impacted by the change to the GED test itself in January 2014, which saw dramatically lower passage rates nationwide. However, TWC’s experience in program transformation with the Boards has been that there is usually a period of one to two years after the transformation where performance numbers drop before rebounding and ultimately improving.
Texas’ VR programs met or exceeded performance expectations over the last two years with the exception of the Earnings Ratio measures. General VR participants only achieved 92.69 percent of target for the Earnings Ratio measure for FY 2014. Preliminary FY 2015 General VR performance shows improvement to 94.04 percent of target on the measure, and performance may meet expectations as the data is finalized. However, preliminary FY 2015 performance for Blind Services participants is currently at only 91.19 percent of target, and while it could improve as the data finalizes, the larger distance from the 95 percent level makes this less likely. RSA research has shown that states with higher average workforce wages such as Texas typically have lower performance on the Earnings Ratio measures.
TWC’s SCSEP performance for Average Earnings was less than 95 percent of target in both PY 2013 and PY 2014, and performance in PY 2014 for Service to Most in Need was 94.65 percent of target. Average Earnings performance has been affected by budget cutbacks at public host agencies—resulting in participants often being hired half-time instead of full-time—and more stringent documentation requirements, which made it more difficult to report earnings results.
PY 2014 represents the fifth consecutive year that TWC met all five MSFW equity indicators. TWC has met all five indicators in eight of the last eleven years.