U.S. flag

An official website of the United States government

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Https

Secure .gov websites use HTTPS
A lock () or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

2 Year Modification

Plan: New Hampshire PYs 2018-2019
Combined Plan C

Section: Unemployment Insurance Program

Narrative: a. 4.

Published
Located in:
  • Unemployment Insurance (UI)

    The Jobs for Veterans’ State Grants (JVSG) are mandatory, formula-based staffing grants to (including DC, PR, VI and Guam). The JVSG is funded annually in accordance with a funding formula defined in the statute (38 U.S.C. 4102A (c) (2) (B) and regulation and operates on a fiscal year (not program year) basis, however, performance metrics are collected and reported (VETS-200 Series Reports) quarterly (using four “rolling quarters”) on a Program Year basis (as with the ETA- 9002 Series). Currently, VETS JVSG operates on a five-year (FY 2015-2019), multi-year grant approval cycle modified and funded annually.

    In accordance with 38 U.S.C. § 4102A(b)(5) and § 4102A(c), the Assistant Secretary for Veterans' Employment and Training (ASVET) makes grant funds available for use in each State to support Disabled Veterans' Outreach Program (DVOP) specialists and Local Veterans' Employment Representatives (LVER) staff. As a condition to receive funding, 38 U.S.C. § 4102A(c)(2) requires States to submit an application for a grant that contains a State Plan narrative, which includes:

a. 4. Corrective Action Plans (caps)

Corrective Action Plans (CAPs): CAPs are expected as a part of the SQSP when State’s annual performance does not meet the established criteria for core measures, Secretary’s Standards, UI program, assurances, and other program deficiencies identified in the annual SQSP guidance provided by the Department. The CAP must list both specific milestones for key corrective actions or improvement activities, and the completion date for each milestone.

Current Narrative:

New Hampshire MEASURES/PROGRAMS TO BE ADDRESSED FOR ALTERNATE SQSP 2020 Measures/Programs to be Addressed (Each Measure Below is Hyperlinked to the CAP Worksheet) Acceptable Level of Performance (ALP) Corrective Action Plan (CAP) Narrative Required (In Word Doc.) Performance Level N BENEFITS First Payment Promptness = 87% 87.34% First Payment Promptness (IntraState 14/21 Days) = 87% 88.15% First Payment Promptness (InterState 14/21 Days) = 70% 83.87% First Payment Promptness (IntraState 35 Days) = 93% 97.15% First Payment Promptness (InterState 35 Days) = 78% 94.84% Nonmonetary Determination Timeliness = 80% 86.17% Nonmonetary Determination Quality - Separations = 75% 83.49% Nonmonetary Determination Quality - Nonseps = 75% 86.34% APPEALS Lower Authority Appeals (30 Days) = 60% 89.77% Lower Authority Appeals (45 Days) = 80% 96.86% Average Age of Pending Lower Authority Appeals = 30 days 14.20 Average Age of Pending Higher Authority Appeals = 40 days 16.10 Lower Authority Appeals Quality = 80% 98.72% TAX New Employer Status Determinations Timelapse = 70% 90.80% Tax Quality (Part A) No more than 3 tax functions failing TPS in a year X Failed: Status Determination — New Field Audit Debits/Billings Contributory Debits/Billings Reimbursing Tax Quality (Part B) The same tax function cannot fail for 3 consecutive years Pass TPS Sample Reviews Pass X Failed: Debits/Billings Reimbursing Effective Audit Measure Pass 4 factors/score = 7 Pass INTEGRITY Improper Payments Measure 10% X 12.55% Detection of Overpayments - 3 Year Measure = 50% & = 95% 83.34% Overpayment Recovery Measure = 68% 118.30% Data Validation - Benefits (All Submitted & Passing) All Benefit Pops Submitted & Passing X Failed: Populations (3, 3a, 5, 8, 12-15) Mod 4 (Seps, Non-Seps, Appeals) Data Validation - Tax (All Submitted & Passing) All Tax Pops Submitted & Passing X Failed: Populations (3, 4) Mod 4 (New, Inactive) BAM NDNH BAM Compliance Pass Pass BAM Operations Compliant Pass All M&P X Fail: PCA population variances; DCA population comparison variances (Monetary, Separation and Non-Separation populations) OTHER Incorrect Recording of Issue Detection Date 95% X Fail Incorrect Recording of Determination Date 95% Pass UI Reporting Requirements Pass Pass GPRA First Payment Promptness (IntraState 14/21 Days) 87% 88.15% Detect Benefit Overpayments 54.5% 103.26% Establish Tax Accounts Promptly 89% 91.41%

State: New Hampshire Federal Fiscal Year: 2019-2020 SQSP Corrective Action Plan & Progress Report Back to Biennial Overview 2019 Back to Alternate Overview 2020 Instructions

Performance Measure Improper Payments Measure ALP 10% CAP Based on SQSP 2019 Performance Level 10.37% CAP Based on SQSP 2020 Performance Level12.55% State's Target/Actual Performance 12/31/2018 Quarter 1 Target 10.00% Actual 11.01% 12.55% 9.39% 3/31/2019 Quarter 2 Target 10.00% Actual 12.55% 6/30/2019 Quarter 3 Target 9.80% Actual 9.39% 9/30/2019 Quarter 4 Target 9.80% Actual 12/31/2019 Quarter 5 Target 9.50% Actual 3/31/2020 Quarter 6 Target 9.50% Actual 6/30/2020 Quarter 7 Target 9.40% Actual 9/30/2020 Quarter 8 Target 9.30% Actual

Regional Office Comments in cell below: Corrective Action Plan Summary: The Summary must provide: Alternate Year Plan Updates A. The Reason for the deficiency. NH has improved greatly in reducing improper payments as a result of misreported earnings through its recently implemented Claimant view rewrite. That being said, the increase in improper payments is due to unacceptable work searches. In the most recent fiscal year, in NH, 44% of all improper payments are the result of unverifiable work searches. NH lost resources in 2016 with the expiration of SBR funds to support a part time position dedicated to work search verification. Due to lack of resources NH has been unable to conduct work search verifications. Alternate Year Plan Updates B. Provide a description of your "Plan-Do-Check-Act" corrective action plan which will be undertaken to achieve the acceptable level of performance. Examples of major actions and activities; aka, Milestones, include IT requirements, business process analysis, training, implementing process improvements, measuring effectiveness, etc. Please include a description of these actions/activities in each stage of your "Plan-Do-Check-Act" corrective action plan. NH will focus available resources toward work search review and verification, especially during slower adjudication times of year. We will also establish monthly meetings between our QC supervisor, the UI Director, Benefit Payment Control Supervisor and our ES Director to both identify specific indicators as well as to identify available resources to assist with this project. Alternate Year Plan Updates C. If a plan was in place the previous year, an explanation of why the actions contained in that plan were not successful in improving performance; and, an explanation of why the actions now specified will be more successful. Alternate Year Plan Updates D. A brief description of plans for monitoring and assessing accomplishment of planned actions and for controlling quality after achieving performance goals. Monthly meetings as stated above, to remain up to date with current performance as well as to identify indicators of poor work searches and develop plans to focus our energy toward those specific indicators. Alternate Year Plan Updates NOTE: Enter an "X" in the box to the right if the desired improvements will not be accomplished by the end of the current fiscal years (the two consecutive fiscal years for which the plan is in effect). Summarize, below, the major actions remaining to be taken in subsequent fiscal years and include a projected completion date as to when the performance goal will be achieved. (Remaining Major Actions in this cell.) Milestones 1. Re-write of work search program within our benefits payment system - Completion Date 6/30/2019 Quarter 1 status report (12/31/2018): Business requirements have been developed and a Business Requirements Document has been produced. Next step is to bring team members together to review and provide input. Quarter 2 status report (3/31/2019): While the improper payment rate has risen slightly over previous results - NH has made some changes to work search requirements and verification which should improve results slightly in the near term. The rewrite of our work search program is on schedule to go into production by September 30, 2019. Quarter 3 status report (6/30/2019): While the improper payment rate is not yet available for the period ended June 30, 2019, The one-year period ended March 31, 2019 shows NH with an improper payment rate of 9.39% (per email from Cathy Lovely regarding Imp rates). NH is currently meeting standards for Imp payments. NH is continuing with an update to the system’s ability to process accurate work search records, including messaging to encourage better quality work searches. This project is being delayed due to a hardware upgrade. Work search is expected to be completed by October 31, 2019. Quarter 4 status report (9/30/2019): Quarter 5 status report (12/31/2019): Quarter 6 status report (3/31/2020): Quarter 7 status report (6/30/2020): Quarter 8 status report (9/30/2020):

Benefits Data Validation State: New Hampshire Federal Fiscal Year: 2019-2020 SQSP Corrective Action Plan & Progress Report Back to Biennial Overview 2019 Back to Alternate Overview 2020 Instructions

Performance Measure ALP State's Target/Actual Performance Data Validation Benefits - All Submitted and PassingSubmitted & Passing CAP Based on SQSP 2019 Performance Level CAP Based on SQSP 2020 Performance Level 12/31/2018 Quarter 1 Target Pass Actual 3/31/2019 Quarter 2 Target Pass Actual Pass 6/30/2019 Quarter 3 Target Pass Actual 9/30/2019 Quarter 4 Target Pass Actual 12/31/2019 Quarter 5 Target Pass Actual 3/31/2020 Quarter 6 Target Pass Actual 6/30/2019 Quarter 7 Target Pass Actual 9/30/2019 Quarter 8 Target Pass Actual Population 3a 12/31/2018 Quarter 1 Target Actual 3/31/2019 Quarter 2 Target Actual 6/30/2019 Quarter 3 Target Actual 9/30/2019 Quarter 4 Target Actual 12/31/2019 Quarter 5 Target Actual 3/31/2020 Quarter 6 Target Actual 6/30/2019 Quarter 7 Target Actual 9/30/2019 Quarter 8 Target Actual Population 5 12/31/2018 Quarter 1 Target Pass Actual 3/31/2019 Quarter 2 Target Pass Actual Fail 6/30/2019 Quarter 3 Target Pass Actual 9/30/2019 Quarter 4 Target Pass Actual 12/31/2019 Quarter 5 Target Pass Actual 3/31/2020 Quarter 6 Target Pass Actual 6/30/2019 Quarter 7 Target Pass Actual 9/30/2019 Quarter 8 Target Pass Actual Population 8 12/31/2018 Quarter 1 Target Pass Actual 3/31/2019 Quarter 2 Target Pass Actual Fail 6/30/2019 Quarter 3 Target Pass Actual 9/30/2019 Quarter 4 Target Pass Actual 12/31/2019 Quarter 5 Target Pass Actual 3/31/2020 Quarter 6 Target Pass Actual 6/30/2019 Quarter 7 Target Pass Actual 9/30/2019 Quarter 8 Target Pass Actual Population 9 12/31/2018 Quarter 1 Target Pass Actual 3/31/2019 Quarter 2 Target Pass Actual Pass 6/30/2019 Quarter 3 Target Pass Actual 9/30/2019 Quarter 4 Target Pass Actual 12/31/2019 Quarter 5 Target Pass Actual 3/31/2020 Quarter 6 Target Pass Actual 6/30/2019 Quarter 7 Target Pass Actual 9/30/2019 Quarter 8 Target Pass Actual Population 12 12/31/2018 Quarter 1 Target Pass Actual 3/31/2019 Quarter 2 Target Pass Actual Fail 6/30/2019 Quarter 3 Target Pass Actual 9/30/2019 Quarter 4 Target Pass Actual 12/31/2019 Quarter 5 Target Pass Actual 3/31/2020 Quarter 6 Target Pass Actual 6/30/2019 Quarter 7 Target Pass Actual 9/30/2019 Quarter 8 Target Pass Actual Population 13 12/31/2018 Quarter 1 Target Pass Actual 3/31/2019 Quarter 2 Target Pass Actual Fail 6/30/2019 Quarter 3 Target Pass Actual 9/30/2019 Quarter 4 Target Pass Actual 12/31/2019 Quarter 5 Target Pass Actual 3/31/2020 Quarter 6 Target Pass Actual 6/30/2019 Quarter 7 Target Pass Actual 9/30/2019 Quarter 8 Target Pass Actual Population 14 12/31/2018 Quarter 1 Target Pass Actual 3/31/2019 Quarter 2 Target Pass Actual Fail 6/30/2019 Quarter 3 Target Pass Actual 9/30/2019 Quarter 4 Target Pass Actual 12/31/2019 Quarter 5 Target Pass Actual 3/31/2020 Quarter 6 Target Pass Actual 6/30/2019 Quarter 7 Target Pass Actual 9/30/2019 Quarter 8 Target Pass Actual Population 14 12/31/2018 Quarter 1 Target Pass Actual 3/31/2019 Quarter 2 Target Pass Actual Fail 6/30/2019 Quarter 3 Target Pass Actual 9/30/2019 Quarter 4 Target Pass Actual 12/31/2019 Quarter 5 Target Pass Actual 3/31/2020 Quarter 6 Target Pass Actual 6/30/2019 Quarter 7 Target Pass Actual 9/30/2019 Quarter 8 Target Pass Actual Population 15 12/31/2018 Quarter 1 Target Pass Actual 3/31/2019 Quarter 2 Target Pass Actual Fail 6/30/2019 Quarter 3 Target Pass Actual 9/30/2019 Quarter 4 Target Pass Actual 12/31/2019 Quarter 5 Target Pass Actual 3/31/2020 Quarter 6 Target Pass Actual 6/30/2019 Quarter 7 Target Pass Actual 9/30/2019 Quarter 8 Target Pass Actual Mod 4 Seps 12/31/2018 Quarter 1 Target Pass Actual 3/31/2019 Quarter 2 Target Pass Actual Fail 6/30/2019 Quarter 3 Target Pass Actual 9/30/2019 Quarter 4 Target Pass Actual 12/31/2019 Quarter 5 Target Pass Actual 3/31/2020 Quarter 6 Target Pass Actual 6/30/2019 Quarter 7 Target Pass Actual 9/30/2019 Quarter 8 Target Pass Actual Regional Office Comments in cell below: Corrective Action Plan Summary: The Summary must provide: Alternate Year Plan Updates A. The Reason for the deficiency. NH has long had issues with reporting within our benefit payment system. NH completed an SBR funded project to rewrite all Federal Reports. This was implemented in June of this year. It is expected NH will now pass all data validation measures beginning with quarter four of this year. Alternate Year Plan Updates B. Provide a description of your "Plan-Do-Check-Act" corrective action plan which will be undertaken to achieve the acceptable level of performance. Examples of major actions and activities; aka, Milestones, include IT requirements, business process analysis, training, implementing process improvements, measuring effectiveness, etc. Please include a description of these actions/activities in each stage of your "Plan-Do-Check-Act" corrective action plan. NH will continue to monitor its reporting and correct any possible system defects resulting from the recent rewrite as they arise. Alternate Year Plan Updates C. If a plan was in place the previous year, an explanation of why the actions contained in that plan were not successful in improving performance; and, an explanation of why the actions now specified will be more successful. It is believed actions have been successful, quarter four of this year will be the best indicator of our results. Alternate Year Plan Updates D. A brief description of plans for monitoring and assessing accomplishment of planned actions and for controlling quality after achieving performance goals. In some cases, comparison of manual reports with system generated reports, in other cases, through data validation exercises. Alternate Year Plan Updates NOTE: Enter an "X" in the box to the right if the desired improvements will not be accomplished by the end of the current fiscal years (the two consecutive fiscal years for which the plan is in effect). Summarize, below, the major actions remaining to be taken in subsequent fiscal years and include a projected completion date as to when the performance goal will be achieved. (Remaining Major Actions in this cell.) Milestones Federal Reporting Re-write went into production on 6/28/2018 Completion Date Quarter 1 status report (12/31/2018): DV passed all validations Quarter 2 status report (3/31/2019): NH had a difficult time with Dv this year. Some programming errors resulted in failing populations 8 and pops 12-15 along with mod 4. Two primary errors resulted in these fails. The first had to do with a comma separated value error. When testing was done for mod 4 we did not have any employers whose name was separated by a comma - when the sample was run we did have employers with names separated by a comma. Our system read this incorrectly and populated part of the employers name where the separation should have been indicated. This has been corrected and tested - mod 4 should be correct next year. Populations 12-15 failed because of an error in programming the date of the overpayment. We initially programmed it to be the date the overpayment decision was created. In reviewing our law, an overpayment cannot exist until the claimant has been notified. This means the date of creation of the overpayment should be the mail date of the decision and not the date the decision was created - this rendered the whole sample incorrect. This has been corrected and will produce accurate results next year. Population 5 will not pass until we rewrite our mass layoff program. The system does not correctly identify and count mass layoff claims. We have a rewrite scheduled for fourth quarter of this year and hope to implement by 12/31/19. Quarter 3 status report (6/30/2019): We believe we have corrected all but population 5. Unfortunately, we currently do not have staff availability to verify our results. We are hoping to have our QC supervisor hired within the next 60 days. Verifying our results will be a high priority once this person is brought on board. Quarter 4 status report (9/30/2019): Quarter 5 status report (12/31/2019): Quarter 6 status report (3/31/2020): Quarter 7 status report (6/30/2020): Quarter 8 status report (9/30/2020):

Tax Data Validation State: New Hampshire Federal Fiscal Year: 2019-2020 SQSP Corrective Action Plan & Progress Report Back to Biennial Overview 2019 Back to Alternate Overview 2020 Instructions

Performance Measure ALP Submitted & Passing CAP Based on SQSP 2019 Performance Level CAP Based on SQSP 2020 Performance Level State's Target/Actual Performance 12/31/2018 Quarter 1 3/31/2019 Quarter 2 6/30/2019 Quarter 3 9/30/2019 Quarter 4 12/31/2019 Quarter 5 3/31/2020 Quarter 6 6/30/2020 Quarter 7 9/30/2020 Quarter 8 Data Validation Tax - All Submitted and Passing Population 3 Population 3 Target Pass 12/31/2018 Quarter 1 3/31/2019 Quarter 2 Target Pass Actual Fail 6/30/2019 Quarter 3 9/30/2019 Quarter 4 12/31/2019 Quarter 5 3/31/2020 Quarter 6 6/30/2020 Quarter 7 9/30/2020 Quarter 8

Population 4 Population 4 Target Pass 12/31/2018 Quarter 1 3/31/2019 Quarter 2 Target Pass Actual Fail 6/30/2019 Quarter 3 9/30/2019 Quarter 4 12/31/2019 Quarter 5 3/31/2020 Quarter 6 6/30/2020 Quarter 7 9/30/2020 Quarter 8

Actual Fail

Mod 4 Status New Mod 4 Status New 12/31/2018 Quarter 1 3/31/2019 Quarter 2 6/30/2019 Quarter 3 9/30/2019 Quarter 4 12/31/2019 Quarter 5 3/31/2020 Quarter 6 6/30/2020 Quarter 7 9/30/2020 Quarter 8

Mod 4 Terminate Mod 4 Terminate 12/31/2018 Quarter 1 3/31/2019 Quarter 2 6/30/2019 Quarter 3 9/30/2019 Quarter 4 12/31/2019 Quarter 5 3/31/2020 Quarter 6 6/30/2020 Quarter 7 9/30/2020 Quarter 8 Regional Office Comments in cell below: Corrective Action Plan Summary: The Summary must provide: Alternate Year Plan Updates A. The Reason for the deficiency. NH has long had issues with reporting within our benefit payment system. NH completed an SBR funded project to rewrite all Federal Reoprts. This was implemented in June of this year. It is expected NH will now pass all data validation measures beginning with quarter four of this year. Alternate Year Plan Updates B. Provide a description of your "Plan-Do-Check-Act" corrective action plan which will be undertaken to achieve the acceptable level of performance. Examples of major actions and activities; aka, Milestones, include IT requirements, business process analysis, training, implementing process improvements, measuring effectiveness, etc. Please include a description of these actions/activities in each stage of your "Plan-Do-Check-Act" corrective action plan. NH will continue to monitor its reporting and correct any possible system defects resulting from the recent rewrite as they arise. Alternate Year Plan Updates C. If a plan was in place the previous year, an explanation of why the actions contained in that plan were not successful in improving performance; and, an explanation of why the actions now specified will be more successful. It is believed actions have been successful, quarter four of this year will be the best indicator of our results. Alternate Year Plan Updates D. A brief description of plans for monitoring and assessing accomplishment of planned actions and for controlling quality after achieving performance goals. In some cases, comparison of manual reports with system generated reports, in other cases, through data validation excercises. Alternate Year Plan Updates NOTE: Enter an "X" in the box to the right if the desired improvements will not be accomplished by the end of the current fiscal years (the two consecutive fiscal years for which the plan is in effect). Summarize, below, the major actions remaining to be taken in subsequent fiscal years and include a projected completion date as to when the performance goal will be achieved. (Remaining Major Actions in this cell.) Milestones Federeal Reporting Re-write went into production on 6/28/2018 Completion Date Quarter 1 status report (12/31/2018): DV passed all validations Quarter 2 status report (3/31/2019): 2019 Tax Items due Accounts Receivable (Population 4) and Status Determination (Population 3) Overall Population scores failed. Our Information Technology programmer and TPS Reviewer are taking a closer look at the steps, timing, actual location and programming within our management information system. Some programming adjustments have been planned and scheduled. NH anticipates that the initiatives taken from DV team meetings and testing extract files our Tax Data Validation Results should improve for Validation Year 2020. Quarter 3 status report (6/30/2019): Programming changes have been made which should provide accurate Tax DV results. We have not yet had the opportunity to verify the results. We are currently in the process of a major hardware upgrade which will delay any programming changes and could impact any validations through October 15, 2019. Quarter 4 status report (9/30/2019): Quarter 5 status report (12/31/2019): Quarter 6 status report (3/31/2020): Quarter 7 status report (6/30/2020): Quarter 8 status report (9/30/2020):

Benefit Accuracy Measurement (BAM) State: New Hampshire Federal Fiscal Year: 2019-2020 SQSP Corrective Action Plan & Progress Report Back to Biennial Overview 2019 Back to Alternate Overview 2020 Instructions

Performance Measures CAP Based on SQSP 2019 Performance Level CAP Based on SQSP 2020 Performance Level State's Target/Actual Performance Performance Measures ALP -10 & > 5% CAP Based on SQSP 2019 Performance Level CAP Based on SQSP 2020 Performance Level -13.77% State's Target/Actual Performance Target Actual

BAM Operations Compliant - Monetary Comparison Reports ALP ± 15% CAP Based on SQSP 2019 Performance Level CAP Based on SQSP 2020 Performance Level -42.71% State's Target/Actual Performance Target Actual

BAM Operations Compliant - Separation Comparison Reports ALP ± 15% CAP Based on SQSP 2019 Performance Level -15.24% CAP Based on SQSP 2020 Performance Level -17.97% State's Target/Actual Performance Target -15.24% Actual

BAM Operations Compliant - Nonseparation Comparison Reports ALP ± 15% CAP Based on SQSP 2019 Performance Level -17.88% CAP Based on SQSP 2020 Performance Level -19.77% State's Target/Actual Performance Target -17.88% Actual Regional Office Comments in cell below: Corrective Action Plan Summary: The Summary must provide: Alternate Year Plan Updates A. The Reason for the deficiency. BAM Comparison reports had been generated off of other system reports which were known to be inaccurate. NH has completed a rewrite of all of its Federal Reports and is now working on rewruiting our BAM Comparison reports so that they pull from the new, revised data. Alternate Year Plan Updates B. Provide a description of your "Plan-Do-Check-Act" corrective action plan which will be undertaken to achieve the acceptable level of performance. Examples of major actions and activities; aka, Milestones, include IT requirements, business process analysis, training, implementing process improvements, measuring effectiveness, etc. Please include a description of these actions/activities in each stage of your "Plan-Do-Check-Act" corrective action plan. We are in the process of developing a system enhancement to draw BAM comparisons from the newly created federal Reports within our system. Target completion for this is 12/31/2018. Alternate Year Plan Updates C. If a plan was in place the previous year, an explanation of why the actions contained in that plan were not successful in improving performance; and, an explanation of why the actions now specified will be more successful. BAM comparison reports are dependent upon other Federal Reports being accurate. The rewrite of Federal Reports was comeplted in June of this year. BAM comparison reports are now in development with expected launch to production of 12/31/2018. Alternate Year Plan Updates D. A brief description of plans for monitoring and assessing accomplishment of planned actions and for controlling quality after achieving performance goals. Ongoing meetings with QC Supervisor, Developers and UI Director to ensure task stays on schedule. Alternate Year Plan Updates NOTE: Enter an "X" in the box to the right if the desired improvements will not be accomplished by the end of the current fiscal years (the two consecutive fiscal years for which the plan is in effect). Summarize, below, the major actions remaining to be taken in subsequent fiscal years and include a projected completion date as to when the performance goal will be achieved. (Remaining Major Actions in this cell.) Milestones Federeal Reporting Re-write went into production on 6/28/2018 Completion Date Quarter 1 status report (12/31/2018): DV passed all validations Quarter 2 status report (3/31/2019): This measure failed due to an error in programming for comma separated values. This also resulted in failuresin our DV populations. This has since been corrected. Quarter 3 status report (6/30/2019): We have not yet had the opportunity to validate our esults - we are awaiting the hiring of our new QC supervisor. Quarter 4 status report (9/30/2019): Quarter 5 status report (12/31/2019): Quarter 6 status report (3/31/2020): Quarter 7 status report (6/30/2020): Quarter 8 status report (9/30/2020):