Plan: Washington PYs 2024-2027
Combined Plan C

Section: Unemployment Insurance Program

Narrative: a. 3.

Modification
Located in:
  • Unemployment Insurance (UI)

    (OMB Control Number: 1205-0132)

    The Unemployment Insurance (UI) program requires a State Quality Service Plan (SQSP) on a 2-year planning cycle that is a condition of receipt of administrative funding to administer the program. The SQSP is the State’s UI performance management and planning process that allows for an exchange of information between Federal and State partners to enhance the UI program’s ability to reflect their joint commitment to performance excellence and client-centered services. A formal two-year SQSP is submitted biennially. On the off years, States may be required to modify the SQSP with additional corrective action plans and narrative if they are failing any new performance measures, and they are required to provide updated budget documents, certifications, and assurances. ETA Handbook No. 336, 18th Edition provides detailed guidance for the preparation and submittal of the SQSP and supplemental guidance is provided in an annual UIPL, issued as UIPL 15-19 for the FY 2020  SQSP. The Social Security Act (SSA) sections 302 and 303 authorize the Secretary of Labor to provide funds to administer the UI program and govern the expenditure of those funds. States that choose the option to include UI in a WIOA Combined State Plan will be required to submit their SQSP through the Combined State Plan process. The SQSP must be prepared in accordance to the instructions in ET Handbook 336, 18th Edition and there are no changes to the established SQSP cycle if a State chose to submit their SQSP through the Combined State Plan process.

a. 3. The State Plan Narrative

State Plan Narrative is a vital element of the SQSP that provides a vehicle for sharing with the Federal partner State-specific efforts that affect the administration of the UI Program. The State Plan Narrative allows the State to describe in a single narrative: a) State performance in comparison to the Government Performance Review Act goals; b) actions planned to correct deficiencies regarding UI programs, UI program reviews and reporting requirements; and c) results of customer satisfaction surveys (optional).

Current Narrative:

Alternate Year Submittal

(Washington – Fiscal Years 2023 and 2024)

A. Overview

  1. State priorities and the strategic direction the state has adopted to ensure continuous improvement.

Vision, Mission and Objectives

Washington’s Employment Security Department (ESD) launched a four-year strategic plan for 2022 through 2026. This plan brings together strategies focused on employee engagement, organizational excellence and customer service, all with specific measures and actions to track progress towards goals. Measures are assessed routinely against their conditions for success, including strategic plan quarterly review. Now in year two of the plan, ESD continues to focus on employee engagement, organizational excellence and customer service goals that promote a people-centered, equity-focused culture and service delivery model.

ESD’s strategic plan theme of “Now. Together” reflects that this work is together, and recognizes that the future is shaped by actions taken now to build a better future. The “Now. Together” vision, mission and values support both the statewide Pro-Equity, Anti-Racism (PEAR) vision and ESD’s own strategic plans. Please see attached Strategic Plan and Values for additional details on current agency priorities. 

Vision: Everyone in Washington has full access to the opportunities, power and resources they need to flourish and achieve their full potential.

Mission: We contribute to healthy communities by providing people equitable access to resources that improve economic security.

Values:

  • Access
  • Love
  • Equity
  • Belonging
  • Stewardship

Looking Forward

ESD continues to address difficulties stemming from the pandemic, from backlogs and shifting workloads, to fraud management and overpayment waivers. However, ESD’s focus is moving from recovery to rebuilding: where learning from the past, looking forward and acting now combine to move Washington toward better outcomes for our customers. This is a mindset fostered agency-wide, reflected in its four year Employee Engagement and Organizational Excellence strategies.

One of ESD’s strategic plan goals is “a culture of belong, learning and growth where we are all valued, everyone matters and each of us can lead.” Similarly, ESD is focused on ensuring “our most complex processes are made simple and easy for our staff and customers.” Overall, ESD is working to support every employee, in turn supporting all customers. This includes supporting individual learning through virtual textbooks, encouraging growth with a newly developed and applied internal mentorship program, sharing and advancing knowledge through developmental job assignments, and continuing to work on communicating and achieving performance goals.

As a result of our partnerships with USDOL, NASWA and other external agencies, ESD continues to move forward with grant-funded projects, including a number of Tiger Team and Equity Grant projects. The resources and collaboration supporting projects such as these and others in our UI portfolio along with our strategic plan, are guiding ESD’s work to improve as an organization that meets our UI customer needs.

2. Assessment of past performance and expected future performance. Includes, at state discretion, a discussion of external factors that may have performance implications.

Core Measures and Secretary Standards

Washington met or exceeded USDOL Core Measures and Secretary Standards in five of twenty categories, all measures which met Acceptable Levels of Performance (ALP) during the previous SQSP. ESD will again be providing a Corrective Action Plan (CAP) for the Improper Payments Measure, which did not meet the ALP for its performance period of PIIA 2022 (7/1/2021 – 6/30/2022). Based on more recent pulls of USDOL’s UI Payment Accuracy datasets incorporating available 2023 data, the improper payment rate has decreased, though remains above the ALP of 10 percent.

ESD will continue reporting for all areas under CAP. We will also continue to internally track those measures not currently required to be reported on the SQSP. ESD has recently launched a cross-divisional Integrity Task Force (ITF) to define and clarify integrity by division, identify resource usage and overlap, promote collective wisdom, and create further awareness of program impacts and performance. The ITF will also be used to determine how best to apply grant funds recently awarded to Washington through UIPL 11-23.

UIPL 09-23 (released June 30, 2023) continues the requirement of CAPs for both newly failed measures and continued poor performance. The UIPL also acknowledges lessening and continuing pandemic impacts, while shifting to an overall focus on rebuilding. Many of the same measures remain under CAP in Washington, reflecting that moving from active recovery to rebuilding is a long-term, multiphase process. For example, as we are still recovering, and ESD’s top priority is its Overpayment Project, which seeks to provide relief to customers who had overpayments established during the pandemic. The project focuses on addressing pandemic era overpayments, but the processes used and knowledge gained during the project will be more widely applicable and contribute to improving agency performance.

3. Coordination with other plans, including WIOA.

ESD is an integral partner in the Workforce Innovation and Opportunity Act (WIOA) State Plan and is contributing to development of the state’s 2024-2028 plan. We collaborate with state and local agencies that participate in the workforce system and serve UI claimants, job seekers and businesses. We are actively seeking to break down barriers within the agency and promote a vision of UI benefits as a bridge between employment and re-employment activities across the workforce system.

Due to the overwhelming number of claims stemming from the pandemic, including complicated or fraudulent claims, ESD continues to collaborate with Washington’s Office of Administrative Hearings (OAH) to streamline backlog reduction processes, improve timeliness and support better coordination overall with stakeholders. ESD and OAH have continued a Brief Adjudication Process to address single party issues. In addition, ESD and OAH have completed a Memorandum of Understanding (MOU) that we believe will further address issues in how information is shared, supporting timely appeals by reducing hand-offs and improving efficiencies.

B. Federal emphasis (GPRA goals)

1. State performance compared to the GPRA goals.

Government Performance and Results Act (GPRA)

  • Percent of Intrastate Payments Made Timely (Make Timely Benefit Payments) – Washington 63.1%
    • Target: 87.0% of intrastate first payments for full weeks of unemployment compensation will be made within 14/21 days from the week ending date of the first compensable week.
      • ESD has identified and addressed filters within the identity verification workflow that we believe will help improve timeliness by decreasing unnecessary crossmatch review. However, we continue to work through lingering pandemic-era problems. We are working to balance resource and staffing constraints, current Claims Center needs and the pandemic-related Overpayment Project. We anticipate that it will take time to both find and maintain this balance before it is positively reflected within the measure.
  • Detection of Recoverable Overpayments (Detect Benefit Overpayments) – Washington 63.69%
    • Target: Overpayments established at a rate that is at least 57.5% of the estimated detectable, recoverable overpayments.
      • Washington’s results for the performance period met the GPRA target of at least 57.5%.

At this point, the measure is still drawing from quarters both with and without the work search requirement, which was suspended temporarily during the pandemic and re-implemented in July 2021. In addition, Washington has previously indicated concerns since the numerator (overpayments established by BPC) includes work search-related overpayments and the denominator (estimated overpayments by BAM) does not. We will continue to monitor both this measure and the 3-year Detection of Overpayments as they draw from the same data.

  • Percent of Employer Tax Liability Determinations Made Timely (Establish Tax Accounts Promptly) – Washington 82.5% (results for the year ending 3/31/2023 did not meet USDOL goal)
    • Target: 90.0% of status determinations for new employers will be made within 90 days of the end of the first quarter in which liability occurred.

2. Actions planned to achieve GPRA goals and targets (National Priorities for FY 2024)

Rebuilding and improving program performance by addressing the significant impact that the workload created by the COVID-19 pandemic continues to have on the UI system

ESD remains focused on balancing and meeting varying UI needs, including current needs, pandemic recovery and rebuilding efforts. Ongoing challenges continue to include limited federal administrative funding to support remaining pandemic-related problems.

Following the 2022 revamp of its portfolio management process, ESD continues to prioritize those high impact projects where resources can be properly applied and the project completed. At the same time, projects are not considered only short- or long-term, but require a focus on continuous improvement and initiatives supporting better services and equitable outcomes for customers. ESD continues to study and identify possible ongoing issues within workflows that are preventing the agency from meeting its goals. We want to not only meet acceptable performance levels in the near future but maintain them over time.

Focusing on improving the timely delivery of benefit payments and the reduction of the UI adjudication and appeals backlogs

ESD continues to focus on identifying issues and developing lasting solutions. For example, with first payment promptness and nonmonetary timeliness, we wanted to improve timeliness and reduce backlogs by understanding potential impacts from workflow processes.

During the quarter ending 6/30/2023, ongoing analysis of the identity verification workflow found higher false positive rates associated with ESD – NASWA IDH crossmatch logic, increasing both the workload and timeframe needed to address issues on claims and make timely payments. ESD implemented several modifications to support a more accurate crossmatch, and will continue to analyze fraud controls on a regular basis to ensure functioning and minimize impacts to claimants. 

For intake agents, adjudicators, and Tax & Wage staff, ESD launched a Virtual Textbook incorporating text, audio, video and knowledge assessment checks. This supports UI workflows by allowing staff to train in the way that best fits their learning style, and helps staff better connect with the training materials. We are also focusing on improvement impacts and opportunities team by team. For example, based on input from the Adjudication team, ESD identified an opportunity to transition standard work documentation to a more modern system. The team now has easier access to information, reducing unnecessary searching and improving the timely adjudication of claims.

ESD has continued to prioritize aligning internal systems and processes with OAH to manage appeals backlogs. Through a joint project with OAH, we have conducted process mapping for the current and future state of appeals, and defined a future state map for pilot implementation, for which we anticipate a full pilot launch during summer 2024.

ESD and OAH have also completed a MOU where ESD will have five business days to get appeals to OAH. We believe this MOU will further address issues in how information is shared, supporting timely appeals by reducing hand-offs and improving efficiencies. OAH plans to be out of the backlog by June 2024, with lower authority appeals timeliness measures anticipated to start reflecting those improvements.

Per UIPL 24-21, ESD has continued to submit updates to USDOL on backlogged adjudication and appeals cases. The updates include both regular UI and PUA cases by month, and help ESD monitor progress towards addressing the backlogs.

Ensuring equitable access to UI programs

ESD’s focus on access considers data, customer experience and service accessibility over the long term. The following projects through the UIPL 23-21 Equity Grant reflect our work to understand and ensure equitable access to UI programs.

The Adverse Impact Analysis, Implementation Evaluation, and Net Impact Evaluation Project conducts data analyses from three perspectives: a quantitative investigation of causes and consequences; a qualitative investigation exploring how UI benefits are delivered to people from diverse backgrounds; and a net impact evaluation of services on specified outcome measures. This project expands ESD’s capacity to prepare, organize and analyze UI program equity and diversity data. We anticipate improvement recommendations from the analyses.

ESD does not have an independent data reporting system outside of its benefits management system. This has led to challenges understanding the customer journey from a data perspective because claimants go through multiple systems. The Customer Experience Data Project will create a new data platform that reports data both by stage in the journey and claimant demographic data. ESD will use this platform to better understand disparities in outcomes by stage in the claimant journey.

To further improve and support the customer experience, we have planned an ESD Website Modernization, a project that will replace ESD’s primary public information website. Skilled user experience research indicates user difficulties with the current website, including finding vital information, navigating menu options, and language access barriers. The project will deliver a more usable, accessible and sustainable website. In addition, the project will support a new content governance policy that will establish a framework for creating and maintaining site content.

Following a legislatively mandated project to improve comprehensibility, clarity and readability of UI letters, ESD has identified letters from the early stages of a customer’s journey for translation into seven additional languages. ESD’s UI Translation Services Project will expand language access to claimants who read languages other than English and Spanish, and will help them better navigate their claim.

ESD is partnering with USDOL to better understand worker access to UI benefits at different stages of UI administration, based on demographic and geographic groupings. Through an Equity Data Partnership, USDOL will examine state UI data, returning summarized data to help guide ESD’s strategic planning and analysis.

Supporting the reemployment of unemployment claimants through Reemployment Services and Eligibility Assessments (RESEA), Short-Time Compensation (STC), robust work search activities, and other targeted initiatives

Work search errors are one of Washington’s top three contributors to improper payments for the review period. ESD re-implemented work search requirements during the PIIA 2022 performance period and expanded the list of acceptable work search activities. Moreover, the state enacted legislation providing ESD more flexibility in how it implements work search requirements. These changes require adjustment and stabilization time for claimants and staff to understand and communicate reporting requirements. The Policy team continues to provide clarification and assistance on work search-related questions, with responses available across the agency as guidance.

USDOL’s recent review of Washington’s RESEA program activities did not result in any findings, with the program operating as expected. ESD continues to monitor RESEA compliance for possible improvements, with review information shared with program operations. ESD updated training with staff having completed refresher training in September 2023. These training courses spread knowledge gained across the state, and serve as additional resources for staff if they are struggling with managing specific components of the program. Overall, this approach helps WorkSource staff become more effective in supporting RESEA participants.

Ensuring UI program integrity by assessing and evaluating fraud risks, implementing and maintaining sufficient controls to effectively mitigate the likelihood and impact of fraud, and reducing improper payments

ESD is committed to combating fraud through various identity verification methods, improving prevention, detection and recovery of overpayments, and reducing the improper payment rate. The agency’s Fraud Management Division (FMD) specifically targets potential issues, conducts further verification as needed on flagged claims, and conducts regular data analytics to watch for trends. ESD continues to partner with NASWA, USDOL, OIG and other agencies to gain knowledge and work through the potential issues impacting our efforts to combat fraud. 

Although ESD continues to address workflow issues where possible and collaborate across divisions on staffing and resource availability; backlogs, system enhancements and corrective actions remain largely impacted by the number and complexity of pandemic-era claims. Recent resource reductions following the end of pandemic-era funding, particularly within FMD, are impacting performance across the UI program. ESD has made many operational and systematic changes in response to the pandemic, and it will take time for the changes to stabilize and reflect improvements. FMD will continue to work to address resource constraints to better support these improvements long term.

Addressing worker misclassification

ESD is currently merging auditing functions for our three tax/premium collecting programs (UI, Paid Family and Medical Leave, and Long-Term Services & Supports). This will strengthen our ability to both find and address non-compliance across programs, including addressing worker misclassification. We are working to reinstitute travel and field audits, which were stopped during the pandemic, and build a cross-program vision for effective employer audits that ensure employer compliance and enhance worker access to unemployment benefits for which they are entitled.

Ensuring accurate and complete reporting of ETA Required Reports

The cross-divisional Report Validation Project (RVP), which ran from March 2022 through June 2023, focused on both population and report accuracy through a combined data validation and developer lens. With staffing changes and the subsequent time needed for familiarizing new staff with data validation and reporting specifics, later months of the RVP focused on gaining population-specific knowledge, testing and reviewing solutions in collaboration with the development team, and defining continuous improvement processes. Although the cadence changed over time, the project helped foster a mindset of connection where data validation is linked with ETA reports, and issues and solutions with developer collaboration.

Data validation efforts identified two logic issues in Benefits Population 12 and the ETA 227 report stemming from the administration of CARES Act programs and benefits. We are continuing to focus on both the population and report, and will be looking further into Detection of Overpayments ETA 227 data to better understand the current state and trends.

For some ETA reports, the potential overlap between other agency projects and validation efforts has further impacted report accuracy and completion. For example, the identified issues for Benefits Population 12 are on hold for solution development, given current work on the agency’s Overpayment Project. Because Population 12 is compared with ETA 227 data during the report validation process, developing and implementing solutions while the Overpayment Project is active may contribute to other reporting issues. ESD is working to balance prioritization of projects and ensure solutions are not implemented prematurely.

C. Program review deficiencies

Data Validation (DV)

Data validation work for Validation Year (VY) 2023 occurred as part of the RVP. The project focused on both population and report accuracy through data validation and developer perspectives; however, many efforts were placed on hold due to staffing changes and the time needed to familiarize new RVP staff with validation and reporting specifics. Later months of the project focused on prioritization of identified issues, testing and review of solutions, and item analysis form documentation for those issues that were unlikely to be addressed by the end of the project.

Although staff were not able to perform validations for all VY 2023 populations during the course of the RVP, the end focus on gaining and documenting population-specific knowledge, combined with considering longer term program needs, reflects a more sustainable approach to the data validation process.

D. Program deficiencies

Detection of Overpayments: ALP 50% - 95% (Washington 351.81%)

Washington’s results for Detection of Overpayments for the period ending 3/31/2023 continue to be higher than expected for federal review purposes. The results incorporate BAM estimates for 10/1/2019 through 9/30/2022, and BPC data for 4/1/2020 through 3/31/2023.

Pre-COVID, Washington established a very high proportion of work search-related overpayments in relation to total overpayments. Given the legal structure in Washington regarding work search overpayments, it was mathematically impossible for the state to meet the 95 percent ALP for overpayments established to overpayments detected ratio by virtue of how the ratio is calculated.

Work search requirements were waived during the pandemic until July 2021. Although this should have improved Washington's measure, recent periods rose to above 400 percent, far exceeding previous periods closer to 120 percent. The magnitude of this discrepancy points to probable reporting errors. It is possible that the numerous IT changes implemented in response to pandemic benefit payments impacted the ETA 227 report.

The RVP has identified two logic issues in Benefits Population 12 and ETA 227 that may be affecting the Overpayment Detection Rate: UI amounts incorrectly exclude overpayments paid from the COVID-19 Waiting Weeks, Reimbursement Relief, or Employer Relief entitlements and incorrectly include overpayment weeks that have been transferred to PUA or PEUC claims. These issues were explored during the RVP; however, staff determined that with a large scale Overpayment Project still active, Population 12 and ETA 227 report solutions pushed through to production now may be impacted by the project, possibly requiring new solutions. The Data Validation team is monitoring the issues for further consideration once the Overpayment Project has progressed closer to completion.

Incorrect Recording of the Issue Detection Date

Issue detection date (IDD) recording happens at multiple points of the claim process, and may be affected by where and when issues come into the system. For example, at one point during the pandemic, weekly claims were subject to a two-day hold to help prevent and address fraud. This delayed setting issues that may have been present at the beginning of the two-day hold for the weekly claim. Although ESD did identify a fix to address issue dates like these, we cannot undo issue settings for these claims. More generally, we continue to look at other process improvement efforts related to BTQ-reviewed operations to better help staff correctly identify and set issues, and communicate across divisions. 

Reporting Deficiencies

ESD continues to work though identified data validation and report concerns together with USDOL.

E. Customer service surveys (optional)

F. Other (e.g., approach to maintaining solvency, requests for technical assistance)

ESD appreciates the continued support and collaboration offered by USDOL and NASWA through the various means of monitoring, trainings, and collaboration. We will continue to invest and engage both internally and externally, supporting our staff and welcoming partnerships.

Tiger Team Grant Funds and Consultative Assessments

During summer 2021, ESD went through the Tiger Teams consultative assessment project with USDOL and Grant Thornton staff, and was later approved by USDOL to address several areas of focus. Based on the recommendations of the Grant Thornton team and insights gathered from internal teams, ESD prioritized three enhancements under the Tiger Team UIPL that directly impact claimants: deadline notifications, a shared work letter, and a PUA Able & Available modification.

Based on direct claimant feedback gathered in 1:1 interviews, ESD identified an opportunity to reduce missed deadlines by adding an email notification to claimants two days before their deadline to respond. After implementation, we observed a 20 percent decrease in missed deadlines compared to similar periods in the calendar year in preliminary assessments.

Through feedback from our Shared Work team, we identified a manually created letter that informed claimants transitioning from Shared Work to regular UI of their new requirement to look for work. We have automated this letter, and saved 165 hours of labor in two months of monitoring.

ESD identified a software issue that impacted PUA Claims with Able and Available issues during overlapping regular UI claimed weeks. The system correctly prevented payment for both entitlements, but blocked an agent's ability to resolve the issue in the system, leading to inefficient workflows. This issue has now been resolved.

G. Assurances:

The State will comply with the following assurances:

a. Assurance of Equal Opportunity (EO).

b. Assurance of Administrative Requirements and Allowable Cost Standards.

c. Assurance of Management Systems, Reporting, and Recordkeeping.

d. Assurance of Program Quality.

e. Assurance on Use of Unobligated Funds.

f. Assurance of Prohibition of Lobbying Costs (29 CFR Part 93).

g. Drug-Free Workplace (29 CFR Part 98).

h. Assurance of Contingency Planning.     

Provide the most recent dates for the following:

  • Information Technology (IT) Contingency Plan Implemented: October 2016__
  • IT Contingency Plan Reviewed/Updated:  September 2023_
  • IT Contingency Plan Tested: September 2023_

i. Assurance of Conformity and Compliance.

j. Assurance of Automated Information Systems Security.

Provide the most recent dates for the following:

  • Risk Assessment Conducted:  June 2023  __
  • System Security Plan Reviewed/Updated: September 2023_

k. Assurance of Confidentiality.

l. Assurance of Disaster Unemployment Assistance

  • Conducted Annual DUA Training for DUA Staff                                      ☒ Yes  ☐ No

Provide the date of the training:                                                                            ___April 2022___

  • Developed and/or Maintained a Standard Operating Procedures for use during a major disaster declaration                                                     ☒ Yes  ☐ No