2 Year Modification

Plan: Washington PYs 2018-2019
Combined Plan C

Section: Unemployment Insurance Program

Narrative: a. 4.

Published
Located in:
  • Unemployment Insurance (UI)

    The Jobs for Veterans’ State Grants (JVSG) are mandatory, formula-based staffing grants to (including DC, PR, VI and Guam). The JVSG is funded annually in accordance with a funding formula defined in the statute (38 U.S.C. 4102A (c) (2) (B) and regulation and operates on a fiscal year (not program year) basis, however, performance metrics are collected and reported (VETS-200 Series Reports) quarterly (using four “rolling quarters”) on a Program Year basis (as with the ETA- 9002 Series). Currently, VETS JVSG operates on a five-year (FY 2015-2019), multi-year grant approval cycle modified and funded annually.

    In accordance with 38 U.S.C. § 4102A(b)(5) and § 4102A(c), the Assistant Secretary for Veterans' Employment and Training (ASVET) makes grant funds available for use in each State to support Disabled Veterans' Outreach Program (DVOP) specialists and Local Veterans' Employment Representatives (LVER) staff. As a condition to receive funding, 38 U.S.C. § 4102A(c)(2) requires States to submit an application for a grant that contains a State Plan narrative, which includes:

a. 4. Corrective Action Plans (caps)

Corrective Action Plans (CAPs): CAPs are expected as a part of the SQSP when State’s annual performance does not meet the established criteria for core measures, Secretary’s Standards, UI program, assurances, and other program deficiencies identified in the annual SQSP guidance provided by the Department. The CAP must list both specific milestones for key corrective actions or improvement activities, and the completion date for each milestone.

Current Narrative:

UPDATED 10/30/2018

First Pay Promptness

A. Reason for the deficiency:

First-pay promptness is often affected by the deficiencies associated with nonmonetary timeliness; however, several other factors are also affecting these results. Although significant improvement have been made since UTAB implementation, Washington is still experiencing technology problems that delay claims from becoming valid. There are ongoing issues with combined wage claims. There are ongoing issues with the interface between Washington tax and wage system (NGTS) and UTAB. Federal and military claims still require a large degree of manual management.

B. Provide a description of your “Plan-Do-Check-Act” corrective action plan which will be undertaken to achieve the acceptable level of performance:

Prior to UTAB implementation, achieving non-monetary timeliness had the greatest impact on first pay promptness. Unemployment Insurance Customer Support Division's (UICS) concerted effort to reduce the non-montary backlog resulted in meeting non-monetary timeliness DLA's in ten of the eleven weeks ending with September 1, 2018; however, we met First Pay DLA's in only three of those weeks. UICS will conduct a root cause analysis to uncover why decision timeliness no longer guarantees first pay timeliness and take appropriate corrective action. Note: it is likely some of the root causes will already be addressed in the SQR's listed below, but further research is required. See Milestone 1 below.

UICS reviewed a list of 64 UTAB technical service requests (SQR's) to correct or enhance systems related to the interface with NGTS, the UI Tax and Wage computer system, and to federal data interchanges relating to Combined Wage Claims, Federal Claims, and Military Claims. Managers identified sixteen of the SQR's as having the greatest potential impact on First Pay Promptness, directly through enhanced speed of processing and indirectly through freeing up staff time now spent manually intervening in claims. These SQR's will be prioritzed through a revamped process with weight given to the fact they are identified as part of a SQSP. See Milestones 2 and 3.

UICS is encouraging as many claimants as possible to self-serve by using ESD's on-line eServices portal. Establishing an account has proven difficult for a signifcant percentage of our customers. ESD wil run a pilot to streamline account establishment and review effects on the percentage of claimants establishing on-line accounts. Increasing the percentage of clamants filing intial claims on line will free up staff resources to address complicated issues affecting first pay. See Milestone 4.

C. Previous years’ plan:

First pay timeliness has been negatively impacted over the past 18 months by UTAB implementation and ongoing NGTS interface issues. UTAB design improvements and NGTS issue resolution are ongoing but require more time for completion.

D. Plans for monitoring and assessing accomplishment of planned actions and for controlling quality after achieving performance goals:

Status of technology enhancements are monitored weekly through SQR prioritization and status meetings. WA plans t oconduct a root cause analysis of FirstPay deficiency, identify counter measures and implement improvements by completing a data review and full Lean event by December 2018. To resolve UTAB interface issues with NGTS and wage records we have an existing SQR which we will move up in priority, thus 100% of wages reported without hours will be imported into NGTS without manual intervention. There are fifteen NGTS and federal data interchange issue SQR's, WA will prioritize these and complete by September of 2020. During the NASWA visit it was suggested that we look at alternatives to LexisNexis and we plan to conduct a Lexis Nexis shut off pilot program which will occur on the following schedule, program and test shut off procedures August 2018, initiate testing September 2018, complete an interim evaluation November 2018 and then a Go.No Go decision for extension to be completed by December 2018.

Milestones:

1. Conduct Root Cause Analysis of First Pay deficiency, identify counter measures, implement counter measures. (3/31/2020)

2. Resolve UTAB interface issue with NGTS on handling wage records reported without hours. Existing SQR 6,194 - move up in priority. Performance Measure: 100% of wages reported without hours are imported into NGTS without manual intervention. (12/31/2019)

3. Fifteen NGTS and federal data interchange issue SQR's are prioritized and completed on schedule. (9/30/2020)

4. Conduct LexisNexis shut off pilot. (12/31/2018)

Nonmonetary Determination Timeliness

A. Reason for the deficiency:

Washington is still dealing with several UTAB design challenges that directly affect nonmonetary timeliness. These include: challenges with workflow resulting in delivery of work to adjudicators that is already past timely date or does not afford enough time to properly allow for due process; US mail cases held from work queues until a date threshold even when interested parties have responded, resulting in unnecessary delayed cases and unpredictable and uneven distribution of the work; and continued challenges with duplicate issues and clears that require the attention of adjudicators. Other non-technological factors include changes to the Intake business model resulting in lower timeliness due to when work is presented in relation to business days available and continued attrition among trained adjudicators resulting from growth opportunities, particularly in the Lacey Adjudication Unit.

B. Provide a description of your “Plan-Do-Check-Act” corrective action plan which will be undertaken to achieve the acceptable level of performance:

Washington continues to carry out specific backlog reduction activities. Process improvement teams have examined workload to determine how to specialize rather than have all staff work general queues. Two different pilot work groups used technology to better distribute workload to adjudicators. Specialization helped process improvement teams identify thirty-six UTAB enhancement requests, which have been submitted. Specialized work groups handing discharges and all associate issues and quits and all associated issues will be used to better match capacity with demand.

C. Previous years’ plan:

Nonmonetary timeliness has been negatively impacted over the past 18 months by UTAB implementation. Design improvements are ongoing and staff productivity is increasing, but reaching pre-UTAB levels is still a work in progress.

D. Plans for monitoring and assessing accomplishment of planned actions and for controlling quality after achieving performance goals:

UI benefits managers continue to monitor claim center metrics on a weekly basis, and adjust resources as available.

Milestones:

1. Adjust Intake business model effective 8/20/2018 to allow incoming phone calls five days per week. Monitor workflow to test hypothesis that the change will reduce number of issues presenting late in the week for current 400 to 500 presenting on Thursdays. (12/31/2018)

2. Continue work with business, IT and vendor staff to improve UTAB workflow and implement thirty-six suggested system improvements. Monitor workflow for trends, when cases are presented and nonmonetary timeliness and make adjustments. Top Priority: have the system recognize when a party has responded, evaluate if it is a one or two party case and appropriately transition the case to be presented to an adjudicator before the arbitrary deadline. Milestone 12/31/18 for top priority item. Additional improvments TBD pending developer availablility. (12/31/2018)

3. Conduct deep-dive root cause analysis of why so many issues are resulting in clears, identify mitigation strategies and deploy. Iterative process with first pass done 12/31/18. (12/31/2019)

4. Focus on maintaining reduced backlog through ongoing workload management, adjustment of resources to meet demands and specialization in more complex areas of the workload such as retirements. Ongoing. (9/30/2020)

Nonmonetary Determination Quality

A. Reason for the deficiency:

Time pressures with system development resulted in UTAB launch without standard work documentation or case-specific training. Nonmonetary determination quality suffered due to this lack of case-type specific step-by-step instructions for staff and well as the overall steep learning curve related to the UTAB launch. The quality review tool used by supervisors and leads had to be redesigned to match UTAB and again, specific training was not provided prior to UTAB launch.

B. Provide a description of your “Plan-D-Check-Act” corrective action plan which will be undertaken to achieve the acceptable level of performance:

Addressing shortfall in nonmonetary quality will be done through enhanced refreher training, continued documentation of standard work; increased quality reviews, providing more and easier data visibilty, and working more effectively with policy on quality assurance issues.

C. Previous years’ plan:

N/A

D. Plans for monitoring and assessing accomplishment of planned actions and for controlling quality after achieving performance goals:

See performance measures associated with each action item below. Quality is monitored through weekly sampling of adjudicators' work as well as through BAM and BTQ. Performance deficiencies will be addressed with individual staff improvement plans.

Milestones:

1. Complete training re-write that includes case-specific libraries used for refresher training. Measure number of refresher trainings provided. (12/31/2019)

2. Continue documentation of standard work. This is an ongoing process as standard work is not static, but changes with each process improvement identified. (Multi-year)

3. Enhance existing quality efforts by increasing the number of quality reviews completed by supervisors and leads and institute staff performance improvement plans as required. Measure nNumber of quality reviews completed and number of performance plans completed. Milestone starting October 1, multi-year plan. (Multi-year)

4. Improve data tools available to supervisors and managers that help quickly identify deficiencies and problem areas for action through use of Tableau dashboard. (12/31/2018)

5. Renew the partnership between business and policy staff to strengthen connections between operations and quality assurance functions. (Multi-year)

Lower Authority Appeals

A. Reason for the deficiency:

With the launch of our new UI Benefits system in January 2017, claimants were given substantially greater access to file appeals independent of agents via our e-services interface. This led to a significant increase in the number of appeals filed, and placed great demand on existing staff at the claims centers and the Office of Administrative Hearings. Additionally, the new system required different processes and workflows to assemble appeals packages for submittal to OAH.

B. Provide a description of your “Plan-Do-Check-Act” corrective action plan which will be undertaken to achieve the acceptable level of performance:

We are beginning by reviewing the data to see specifically where the increase in appeals is impacting operations - whether it be an increase in specific types of appeals, system and workflow issues regarding appeal filing, the sheer volume of appeals filed, or lack of agent involvement in the filing that may have resolved issues without the formal filing of an appeal. Our first step will be to take a quick and sober look at the number of changes and their impact on the appeals number, to determine where our best opportunities for improvement lie. After that, we will complete a full business process analysis with internal and external partners to find and fix issues that we identify. Throughout the process, we will be continually monitoring performance data to ensure our efforts are positively impacting those numbers.

C. Previous years’ plan:

We began this CAP in the alternate year of the last reporting period. Since then we have had technical assistance visits from USDOL staff, and completed several business process reviews to streamline appeals processes. However, much work remains between the multiple agencies involved to knock down the backlog.

D. Plans for monitoring and assessing accomplishment of planned actions and for controlling quality after achieving performance goals:

We continue to monitor in partnership with the Office of Administrative Hearings to ensure timely appeals.

Milestones:

1. Review appeal filing data since January 2017 to understand root causes of increased appeals. Complete quick determination of potential factors involved in increase of appeals. This will include review of technology implementation(s), business processes, and staffing changes. (9/30/2019)

2. Develop action plan to address findings regarding root causes of increased appeals and develop additional milestones from that action plan. (9/30/2019)

3. UTAB vendor develop automated UTAB appeals production and timelines reports. Continue interim measures through manual data extract from UTAB. Milestone TBD pending developer availability. (12/31/2019)

4. Continue ongoing process to refine workflows going to Appeals workgroup to reduce work items sent erroneously to the Appeals queue and eliminate manually rerouting work items. (6/30/2019)

5. Complete outstanding action item from Appeals Lean event held in summer 2018. Development of single system to send appeals and associated case files to OAH. Testing to start in September. (12/31/2018)

6. Complete determination letter rewrite project that provides claimants better information on why they were denied benefits. (12/31/2018)

Tax Quality

A. Reason for the deficiency:

The Next Generation Tax System (NGTS) defects continue to be greatly affecting the generating of correct billing statements, processing employer tax reports and payments, and correctly applying payments received. These errors continue to contribute to samples failing in Report Processing, Contributory and Reimbursing Debits/Billings, Credits/Refunds, Employer Tax Rates and Collections during the 2017 TPS reviews. It was recommended in several areas that manuals be updated. Currently, all tax units are working with our Policy unit to update unit manuals and add standard operating procedures to the manuals. All manuals should be completed by June 2019, so all staff will have up to date manuals with one place to go to access procedures. We are continually reviewing our standard operating procedures and providing training to ensure we are properly processing document.

We are continually monitoring processes and when we identify system issues, a ticket is written when necessary. We have business representatives that work with IT weekly to address prioritization of tickets.

The Business Systems Manager is working with IPOne to get the delinquent tax reports filed and accounts inactivated when they no longer have payroll. The current schedule has reports filed by mid-2019.

Under Credit/Refunds a recommendation was made to consider revising a WAC. This has already been discussed with the Legal Appeals Unit and is in the process of being updated.

It was identified in the debits/billings section that there was an excess wage imbalance due to an incorrect SSN. When our new tax accounting system went live in 2014, we were not notifying employers when they had an excess wage imbalance. This ticket has since been deployed and we now are sending excess wage imbalance notification letter to employers when their tax report is posted. Also in this section a recommendation to address erroneous interest calculations. This is currently being worked on by our IT department. This issue should be fixed by first part of 2019.

A recommendation was made to do a comprehensive review of the entire test phase prior to mailing the annual tax rate notices. Annually staff work with IT to review accounts to ensure tax rate notices are accurate. Any defects identified before our IT department works to resolve. If there are any issues identified after run, ticket are written and address before the next years run.

B. Provide a description of your “Plan-Do-Check-Act” corrective action plan which will be undertaken to achieve the acceptable level of performance:

NGTS System defects have been continually monitored by the project’s business teams and steering committees, with bugs being logged, assigned, prioritized and corrected as quickly and effectively as possible.

We are continually monitoring processes and when we identify system issues, a ticket is written when necessary. Therre are diffent teams in our IT department that address issues in different functional areas. There is also a team dedicated to addressing billing issues. We have business representatives that meet twice weekly with IT to address prioritization of old and new tickets. The Business Systems Manager is working with IPOne to get the delinquent tax reports filed, payments and accounts inactivated when they no longer have wages to report.. The current schedule for IPOne to file delinquenty reports and payments is mid-2019. We are currently in the process of reviewing all our standard operating procedures and manuals. This project is schduled to be completed by June 2019. Line staff are involved in the updating of the standard operatin procedures. As each procedure is updated, any training needs are addressed at that time. Our leads and supervisors are also spot checking staff work to identify any training needs.

C. Previous years’ plan:

This has been previously identified as a multi-year CAP. We have made some progress, as demonstrated by passing more samples this year than the year before. Strategic Response unit and the Account Management center made a push to get the “Post as Informational or Actual” queue caught up this past year. That backlog of work contributes to late account set ups. These are quarterly reports submitted with missing account numbers or the account is closed. Once staff contact the customer a new account has to be established or closed accounts have to be reinstated. Many of these actions could result in late Status determinations. This queue is now down from 2500 in October of 2017 to 98 today.

D. Plans for monitoring and assessing accomplishment of planned actions and for controlling quality after achieving performance goals:

UI Tax managers continue to monitor performance statistics regularly and adjust resources as needed. Leadership monitors all activity through regular updates on the tax floor.

Milestones:

1. Log, track, and resolve system defects until NGTS has reached stabilization as defined by the steering committee. Develop reporting and tracking tools to specifically respond to inquiries from RO for more frequent updates on ticket status in relation to Tax Quality, Data Validation, and reporting. (6/30/2019)

2. Work with Tax staff to identify root causes (both technical and process-based) for system inaccuracies, and determine and implement solutions to ensure correct account balances and samples.. (9/30/2019)

3. Increase staff capacity to complete required activities by utilizing Lean techniques to improve efficiency and effectiveness. This will include increasing the number of Tax units having daily huddles to six, and completing and documenting 70 process improvements. (6/30/2019)

4. Implement business process analysis with new system tools to ensure our ability to adjust resources and work methods to best achieve and exceed standards for all tax functions. This includes monthly monitoring progress toward success and training staff on required TPS rules. (6/30/2019)

Detection of Overpayments

A. Reason for the deficiency:

Washington’s results for detection of overpayments for the three year period ending 3/31/18 are higher than expected for federal review purposes because of its work search-related overpayments and how they interact with the federal performance formula. Washington has very strong work-search requirements in state law, mandating a progression to an “all weeks” review if the one week review uncovers eligibility or work-search errors. This results in a number of “all weeks” denials due to work-search errors, which create large overpayments.

The Benefit Accuracy Measurement (BAM) Operational Rate, the denominator of the overpayment detection ratio, excludes work search related overpayments. The numerator, overpayments established, includes work search related overpayments. Washington establishes a very high proportion of work search related overpayments in relation to total overpayments. Given the legal structure in Washington regarding work search overpayments, it is mathematically impossible for the state to meet the 95% acceptable level of performance for overpayments established to overpayments detected ratio by virtue of how the ratio is calculated.

B. Provide a description of your “Plan-Do-Check-Act” corrective action plan which will be undertaken to achieve the acceptable level of performance:

Washington is addressing work-search overpayments from a number of angles. We have built better tools in our new UI Benefits system to provide quicker visibility to work-search related errors on claims. These measures, partnered with expanded RESEA encounters and our existing work on cross-matches, should continue to bring the overall measure down toward the ALP. However, we may not ever be within the 50-95% parameter established due to our structural impediments.

There are also concerns that the combination of struggles in the BAM program and issues with Data Validation in certain benefits populations (see CAPs) may be affecting the underlying data to calculate the overpayment detection ratio. Washington will be continuing corrective actions in both these areas during the period, and will consider where there may be hidden effects on the ETA 227 data that require correction. These efforts will be tracked and reported through appropriate CAP milestones.

C. Previous years’ plan:

Not Applicable

D. Plans for monitoring and assessing accomplishment of planned actions and for controlling quality after achieving performance goals:

The UI Quality Assurance unit will be monitoring progress toward these goals in concert with the other CAPs, and improving communications with UI Operations staff to address these findings.

Milestones:

1. Continue to work with the system and determine how we are counting overpayments as there may be instances where we are double counting, thus causing our numbers and data to be incorrect. (6/30/2019)

2. Schedule and complete a full asessment of work search review processes to address how work search reviews are contributing to our overpayments. (9/30/2019)

3. Conduct follow up calls to claimants and employers prior to request for information deadlines. Our current response rate is 60%, we would like to increase this to 80% by implementing quicker follow up contact. (3/31/2019)

4. Complete a full review of how cases are prioritized and our methodology of investigations. (6/30/2019)

5. Conduct a complete review of data to determine how claimants are filing intital claims versus continued claims. Collecting this data will create additional milestones for a possible push to have all claims filed electronically which tracks data, requires work search information efforts, and eliminates any duplicative information. (3/31/2020)

Benefits Data Validation

A. Reason for the deficiency:

As of 9-30-2017 Washington's new benefit system had several problem reports (Termed SQR's by our vendor) related to both federal reporting and beneefit data validation populations. Our federal reporting and data validation teams worked extensively with agency business analysts assigned to the new system development effort and the vendor to correct thesse SQR's and new ones that were discovered in further testing. This effort required us to correct federal reports and recreate population extracts. We also had help from USDOL in December when several staff members visted us for a consultation visit in December 2017. We continued the testing and correction effort quarter January until final submission and were able to eliminate validation failures in all but three populations. (3, 3a, and 4 ) and 2 modules. Population 4 has since passed for quarter 1 of the new performance year. SQR's are still outstanding for the remainder.

B. Provide a description of your “Plan-Do-Check-Act” corrective action plan which will be undertaken to achieve the acceptable level of performance:

Washington will continue to work with our vendor to correct errors in the remaining populations. We believe population 3a is corrected. The issue was in system data and we won't be able to verify accuracy until we have a full quarter of data after the correction. (10-15-2018) The remaining issues require programming corrections and the corrections are in process. The corrections will be tested as they are completed. The effort level has been identified as larger. Washington would estimate a correction of data validation issues by 12-31-2018.

C. Previous years’ plan:

Washington greatly improved validation results and hopes to cintinue improvement.

D. Plans for monitoring and assessing accomplishment of planned actions and for controlling quality after achieving performance goals:

Washington plans to monitor data and results from current and upcoming improvement events. Senior Management meet regularly to discuss ongoing issues and data validation is a regular topic in these meetings.

Milestones:

1. Verify programming is correct to pass data validation for all benefits populations. Resolve any remaining technical issues with project vendor and IT staff. (12/31/2019)

2. Determine appropriate resources and increase staff capacity to troubleshoot data validation issues by training and knowledge transfer. Create structure for training plan and succession planning to ensure smooth transfer of duties when vacancies arise. (6/30/2019)

3. Continue working on our business process analysis to fully catalog all ETA reports to be produced by the department. This will include multiple divisions and seek to identify and clarify responsibility to the unit and desk level for data production, data verification, system of record by field, and other goals established by the BPA team. (6/30/2019)

Tax Data Validation

A. Reason for the deficiency:

Population 2 failed the Report Validation in timely and secured contributory reports because of defects in the electronic filing program having problems in downloading tax reports into NGTS. IT staff have to intervene to process the tax reports which have taken until the following quarter to do.

Population 3 failed the Report Validation in the "New =90 days" count because the ETA 581 report is incorrectly counting future quarter liability dates.

Population 4 failed the Sample Validation because timely payments are being erroneously captured on the ETA 581 report in the established and liquidated counts, the tax system is not calculating removed amounts and balance amounts correctly.

Module 4 Status New failed because the differences in the count from both the ETA 581 report and TPS universe are including erroneous future liablility dates and the TPS universe is also including predecessor/successor accounts.

Module 4 Successor failed because the differences in the count from both the ETA 581 report and TPS universe are including erroneous future liablility dates

B. Provide a description of your “Plan-Do-Check-Act” corrective action plan which will be undertaken to achieve the acceptable level of performance:

Population 2 - To resolve the uploading problems which will correct the timely and secure counts, a new EAMS (eletronic filing system) is currently being developed and is targeted to go live by the end of the year.

Population 3, Module 4 New and Module 4 Successor - IT is currently looking at both the ETA 581 and TPS universe to program them correctly and which will put them in sync with each other for Module 4 New and Successor. A target date for completion is 10/23/18.

Population 4 - As of July 2018, IT is reprogramming where needed in the accounts receivable field in 401 and business has start some testing for accuracy. No target date of completion has been established.

Lastly, a significant aspect of our difficulties with data validation comes with the specialized knowledge required to thoroughly identify and evaluate the errors we see. We intend to review our resources that we have available for data validation, and pursue knowledge transfer and training (informal and possibly formal) to bring more resources to bear on the issues we find. This will become especially important as we complete the transition to modernized UI systems.

C. Previous years’ plan:

We continue to work to fix the errors in our NGTS system, prioritizing errors that impact our customers ahead of internal issues.

D. Plans for monitoring and assessing accomplishment of planned actions and for controlling quality after achieving performance goals:

Senior managers of the UICS, ESP and WITS divisions meet regularly to discuss status of major UI infrastructure projects. Reporting and data validation is a standard agenda items for these meetings. Additionally, senior agency leadership meet quarterly to review and prioritize all IT projects to balance the needs of the agency. These meetings discuss both large IT replacement projects as well as smaller, emergent IT needs to balance projects and priorities.

Milestones:

1. Work with Tax and IT staff to identify action plan listing specific Tax populations and modules being targeted for correction and identify expected completion date for these corrections. (9/30/2019)

2. Log, track, and resolve system defects until NGTS has reached stabilization as defined by the steering committee. Develop reporting and tracking tools to specifically respond to inquiries from RO for more frequent updates on ticket status in relation to Tax Quality, Data Validation, and reporting. (12/31/2019)

3. Identify root causes for system inaccuracies, and determine and implement solutions to ensure correct account balances and samples. (3/31/2019)

4. Determine appropriate resources and increase staff capacity to troubleshoot data validation issues by training and knowledge transfer. Create structure for training plan and succession planning to ensure smooth transfer of duties when vacancies arise. (6/30/2019)

5. Continue with our business process analysis to fully catalog all ETA reports to be produced by the department. This will include multiple divisions and seek to identify and clarify responsibility to the unit and desk level for data production, data verification, system of record by field, and other goals established by the BPA team. (3/31/2020)

Benefit Accuracy Measurement (BAM)

A. Reason for the deficiency:

The selection process for BAM paid cases in the new UI Benefits system is not correctly tuned to match our overall claimant population.

B. Provide a description of your “Plan-Do-Check-Act” corrective action plan which will be undertaken to achieve the acceptable level of performance:

BAM staff are working with IT staff to identify and correct the errors in case selection algorithms to more closely match the claimant population. We are continuing to review to ensure that root causes are resolved with those fixes.

C. Previous years’ plan:

N/A

D. Plans for monitoring and assessing accomplishment of planned actions and for controlling quality after achieving performance goals:

BAM staff will continue to monitor case selection characteristics to ensure continued compliance.

Milestones:

1. Work with technical staff to identify and correct errors in paid case selection algorithm (9/30/2019)

Facilitate Reemployment

A. Reason for the deficiency:

Washington has not been required to complete a corrective action plan in the past for UI claimants' reemployment rates. We believe the drop in reemployment rates is due to two main factors. First, with Washington being near full employment, people experiencing longer term unemployment have greater barriers that the general population. Second, implementation of UTAB changed some business practices that deprived WorkSource offices of tools that encouraged engagement by UI claimants.

B. Provide a description of your “Plan-Do-Check-Act” corrective action plan which will be undertaken to achieve the acceptable level of performance:

ESD works diligently to closely integrate unemployment compensation and workforce services. The agency’s vision of UI benefits as a support bridge between jobs directly aligns with USDOL’s emphasis on claimant reemployment. Agency strategic plan success measures include reduced duration of UI claims and reduced time to find employment. The action plan includes working more successfully to meet employer needs, which will also result in better access to job opportunities for UI claimants and other WorkSource clients.

As reflected in our strategic plan, we are actively searching for additional ways to integrate our unemployment insurance program with labor exchange programs, and increasing visibility of UI in one-stop centers across the state. We have a strong Reemployment Services and Eligibility Assessments (RESEA) program centered in the one-stops, and are pursuing full integration of our new UI benefits and job-matching computer systems in one customer portal, in order to provide job-seekers with a seamless experience between their job search as they search for employment and their collect unemployment benefits. The portal is a long-term vision and the agency will focus on smaller steps to facilitate reemployment and integrate in-person customer service at one-stop offices with UI services offered via the Claims Centers. See the seven milestones listed below.

C. Previous years’ plan:

N/A

D. Plans for monitoring and assessing accomplishment of planned actions and for controlling quality after achieving performance goals:

WA plans to use a series of events and review of current policies to assess how we are facilitating re-employment. WA had a site visit with NASWA August of 2018 and one of the biggest recommendations was for WA State to do more in the way of follow up with claimants and automatic scheduling for specific groups, specifically with RESEA. In order to increase RESEA initial appointment show rates from 62% to 80% by September 30, 2019 WA will submit a grant modification for our current RESEA grant, finalize business requirements and user stories, develop a software application which will include testing and staff training with a launch date of June 2019. WA will also be looking at practices that were used prior to UTAB implementation to generate call-in letters to selected claimants which will include criteria specific to the claimants area with in demand skills and those with individualized services. The bulk of the work will be contingent on policy review and legislative changes that can be accomplished within the 2019 Legislative session. This will also include pilot programs within local areas to conduct outreach campaigns and secure additional participants. WA plans to conduct these campaigns by reaching out to local businesses during August to November 2018 and tracking measures and outcomes in the following months. A claimant and Job seeker capaign will run from Jaunary to April 2019, again tracking measures and outcomes. We also discovered that we were not prioritizing follow up calls with RESEA claimants and in order to prioritize this function, we will be running a data exchange to determine if staff inititated contacts versus auto-calls will be a better option for imprpoving this milestone. WA plans to launch this follow up program by January of 2019 after we have assessed a data plan and completed staff training.

Milestones:

1. Implement self-scheduling of RESEA claimants for services. Scheduled launch June 2019. (9/30/2020)

2. Reinstitute a practice used prior to UTAB implementation to generate a call-in letter to selected claimants requiring them to report to their local WorkSource office. Selection criteria: claimants with skills in demand in their locality or in need of individualized services. (6/30/2019)

3. Investigate policy and legislative issues related to requiring all UI claimants subject to work search to complete a profile on WorkSource.WA.GOV and upload a job-match ready resume. (12/31/2019)

4. Conduct WorkSource business and job seeker outreach campaigns to secure more participants and increase account creations. Business campaign runs August-November 2018 (6/30/2019)

5. Increase the number of RESEA eligible claimants scheduled for call-in by revisiting the profile criteria to expand the base of UI claimants eligible for RESEA. (9/30/2019)

6. Make reminder calls prior to RESEA appointments to encourage a higher show rate. (3/31/2019)

7. Schedule 100% of RESEA claimants participating in an initial appointment for follow up services unless they have a definite return to work date. (3/31/2019)