The Unemployment Insurance (UI) program requires a State Quality Service Plan (SQSP) on a 2-year planning cycle that is a condition of receipt of administrative funding to administer the program. The SQSP is the State’s UI performance management and planning process that allows for an exchange of information between Federal and State partners to enhance the UI program’s ability to reflect their joint commitment to performance excellence and client-centered services. A formal two-year SQSP is submitted biennially. On the off years, States may be required to modify the SQSP with additional corrective action plans and narrative if they are failing any new performance measures, and they are required to provide updated budget documents, certifications, and assurances. ETA Handbook No. 336, 18th Edition provides detailed guidance for the preparation and submittal of the SQSP and supplemental guidance is provided in an annual UIPL, issued as UIPL 15-19 for the FY 2020 SQSP. The Social Security Act (SSA) sections 302 and 303 authorize the Secretary of Labor to provide funds to administer the UI program and govern the expenditure of those funds. States that choose the option to include UI in a WIOA Combined State Plan will be required to submit their SQSP through the Combined State Plan process. The SQSP must be prepared in accordance to the instructions in ET Handbook 336, 18th Edition and there are no changes to the established SQSP cycle if a State chose to submit their SQSP through the Combined State Plan process.
- a. Contents of a Complete UI SQSP Package
A complete UI SQSP package includes the following documents, as described in Chapter 1, ETA Handbook 336, 18th Edition:
- a. Contents of a Complete UI SQSP Package
a. 4. Corrective Action Plans (CAPs)
CAPs are expected as a part of the SQSP when State’s annual performance does not meet the established criteria for core measures, Secretary’s Standards, UI program, assurances, and other program deficiencies identified in the annual SQSP guidance provided by the Department. The CAP must list both specific milestones for key corrective actions or improvement activities, and the completion date for each milestone.
Current Narrative:
First Pay Promptness -
A. Reason for the Deficiency
Biennial Year Plan: First-pay promptness is often affected by the deficiencies associated with nonmonetary timeliness; however, several other factors are also affecting these results. Although significant improvement have been made since UTAB implementation, Washington is still experiencing technology problems that delay claims from becoming valid. There are ongoing issues with combined wage claims. There are ongoing issues with the interface between Washington tax and wage system (NGTS) and UTAB. Federal and military claims still require a large degree of manual management.
Alternate Year Plan: N/A
B. Provide a description of the "Plan-Do-Check-Act" Corrective Action Plan
Biennial Year Plan: Prior to UTAB implementation, achieving non-monetary timeliness had the greatest impact on first pay promptness. Unemployment Insurance Customer Support Division's (UICS) concerted effort to reduce the non-montary backlog resulted in meeting non-monetary timeliness DLA's in ten of the eleven weeks ending with September 1, 2018; however, we met First Pay DLA's in only three of those weeks. UICS will conduct a root cause analysis to uncover why decision timeliness no longer guarantees first pay timeliness and take appropriate corrective action. Note: it is likely some of the root causes will already be addressed in the SQR's listed below, but further research is required. See Milestone 1 below.
UICS reviewed a list of 64 UTAB technical service requests (SQR's) to correct or enhance systems related to the interface with NGTS, the UI Tax and Wage computer system, and to federal data interchanges relating to Combined Wage Claims, Federal Claims, and Military Claims. Managers identified sixteen of the SQR's as having the greatest potential impact on First Pay Promptness, directly through enhanced speed of processing and indirectly through freeing up staff time now spent manually intervening in claims. These SQR's will be prioritized through a revamped process with weight given to the fact they are identified as part of a SQSP. See Milestones 2 and 3.
UICS is encouraging as many claimants as possible to self-serve by using ESD's on-line eServices portal. Establishing an account has proven difficult for a significant percentage of our customers. ESD will run a pilot to streamline account establishment and review effects on the percentage of claimants establishing on-line accounts. Increasing the percentage of claimants filing initial claims on line will free up staff resources to address complicated issues affecting first pay. See Milestone 4.
Alternate Year Plan: N/A
C. If a plan was in place the previous year, explain why the actions taken in that plan were not successful in improving performance
Biennial Year Plan: First pay timeliness has been negatively impacted over the past 18 months by UTAB implementation and ongoing NGTS interface issues. UTAB design improvements and NGTS issue resolution are ongoing but require more time for completion
Alternate Year Plan: N/A
D. Brief description of plans for monitoring and assessing accomplishment of planned actions and for controlling quality after achieving performance goals
Biennial Year Plan: Status of technology enhancements are monitored weekly through SQR prioritization and status meetings. WA plans to conduct a root cause analysis of FirstPay deficiency, identify counter measures and implement improvements by completing a data review and full Lean event by December 2018. To resolve UTAB interface issues with NGTS and wage records we have an existing SQR which we will move up in priority, thus 100% of wages reported without hours will be imported into NGTS without manual intervention. There are fifteen NGTS and federal data interchange issue SQR's, WA will prioritize these and complete by September of 2020. During the NASWA visit it was suggested that we look at alternatives to LexisNexis and we plan to conduct a Lexis Nexis shut off pilot program which will occur on the following schedule, program and test shut off procedures August 2018, initiate testing September 2018, complete an interim evaluation November 2018 and then a Go/No Go decision for extension to be completed by December 2018.
Alternate Year Plan: N/A
Non-Mon Timeliness -
A. Reason for the Deficiency
Biennial Year Plan: Washington is still dealing with several UTAB design challenges that directly affect nonmonetary timeliness. These include: challenges with workflow resulting in delivery of work to adjudicators that is already past timely date or does not afford enough time to properly allow for due process; US mail cases held from work queues until a date threshold even when interested parties have responded, resulting in unnecessary delayed cases and unpredictable and uneven distribution of the work; and continued challenges with duplicate issues and clears that require the attention of adjudicators. Other non-technological factors include changes to the Intake business model resulting in lower timeliness due to when work is presented in relation to business days available and continued attrition among trained adjudicators resulting from growth opportunities, particularly in the Lacey Adjudication Unit.
Alternate Year Plan: Washington has continued to resolve design issues within UTAB, specifically in regards to workflow and assignments. These fixes, have begun to improve our timeliness, thus resulting in better performance according to USDOL standards. There continue to be remaining fixes to UTAB that have yet to be implemented.
B. Provide a description of the "Plan-Do-Check-Act" Corrective Action Plan
Biennial Year Plan: Washington continues to carry out specific backlog reduction activities. Process improvement teams have examined workload to determine how to specialize rather than have all staff work general queues. Two different pilot work groups used technology to better distribute workload to adjudicators. Specialization helped process improvement teams identify thirty-six UTAB enhancement requests, which have been submitted. Specialized work groups handing discharges and all associate issues and quits and all associated issues will be used to better match capacity with demand.
Alternate Year Plan: Process Improvement teams have made good strides in correcting workload and system issues within UTAB. Washington continues to monitor the affects of each fix to ensure performance levels continue to improve and remain as acceptable.
C. If a plan was in place the previous year, explain why the actions taken in that plan were not successful in improving performance
Biennial Year Plan: Nonmonetary timeliness has been negatively impacted over the past 18 months by UTAB implementation. Design improvements are ongoing and staff productivity is increasing, but reaching pre-UTAB levels is still a work in progress.
Alternate Year Plan: Design improvements continue to be an ongoing milestone for Washington. We expect that the 36 identified design improvements will be complete by 6/30/2020.
D. Brief description of plans for monitoring and assessing accomplishment of planned actions and for controlling quality after achieving performance goals
Biennial Year Plan: UI benefits managers continue to monitor claim center metrics on a weekly basis, and adjust resources as available.
Alternate Year Plan: Metrics continue to be monitored on a weekly basis.
Non-Mon Quality -
A. Reason for the Deficiency
Biennial Year Plan: Time pressures with system development resulted in UTAB launch without standard work documentation or case-specific training. Nonmonetary determination quality suffered due to this lack of case-type specific step-by-step instructions for staff and well as the overall steep learning curve related to the UTAB launch. The quality review tool used by supervisors and leads had to be redesigned to match UTAB and again, specific training was not provided prior to UTAB launch.
Alternate Year Plan: Washington continues to update training manuals and conduct proper staff training. This has negatively impacted Nonmonetary Determination Quality. We expect that the training manual re-write will be complete by 12/31/2019.
B. Provide a description of the "Plan-Do-Check-Act" Corrective Action Plan
Biennial Year Plan: Addressing shortfall in nonmonetary quality will be done through enhanced refresher training, continued documentation of standard work; increased quality reviews, providing more and easier data visibility, and working more effectively with policy on quality assurance issues.
Alternate Year Plan: Washington has implemented a Project Management Format with regular check in's and leadership discussions for tracking and assessing milestones for the CAPs. This approach will allow us to address shortfalls and resources as needed to improve performance levels and adjust as needed throughout the processes of improving the ALPs. Refresher training continues to be developed and documentation of standard work practices are underway. We have begun conducting a review of current policies, including updating policies to be more effective for current business needs and USDOL requirements. As policies are updated, training manuals and communications to staff are developed.
C. If a plan was in place the previous year, explain why the actions taken in that plan were not successful in improving performance
Biennial Year Plan: N/A
Alternate Year Plan: N/A
D. Brief description of plans for monitoring and assessing accomplishment of planned actions and for controlling quality after achieving performance goals
Biennial Year Plan: See performance measures associated with each action item below. Quality is monitored through weekly sampling of adjudicators' work as well as through BAM and BTQ. Performance deficiencies will be addressed with individual staff improvement plans.
Alternate Year Plan: Improvement plans are being managed in a project management format, including charter, project plans and check-ins. Project plans will be addressed in the milestones. Project plans are in place for Training Re-write, Documentation of Standard Adjudication Work, Enhancing Existing Quality Review Efforts, and Renewing Partnership between UI Business and Policy Staff. Currently we are conducting root cause analysis of First Pay, Web Notice Quality and Timeliness, Clears, Adjudication Standard Work, and Adjudication Quality Reviews.
Lower Authority Appeals -
A. Reason for the Deficiency
Biennial Year Plan: With the launch of our new UI Benefits system in January 2017, claimants were given substantially greater access to file appeals independent of agents via our e-services interface. This led to a significant increase in the number of appeals filed, and placed great demand on existing staff at the claims centers and the Office of Administrative Hearings. Additionally, the new system required different processes and workflows to assemble appeals packages for submittal to OAH.
Alternate Year Plan: Lack of standard work processes for processing appeals requests continued to cause significant delays in transmittal of appeal requests to OAH. In addition, increased overall appeals volumes lead to a continuing backlog of cases awaiting processing by OAH. Although OAH hired additional administrative law judges, the agency has been unable to successfully reduce the backlog.
B. Provide a description of the "Plan-Do-Check-Act" Corrective Action Plan
Biennial Year Plan: We are beginning by reviewing the data to see specifically where the increase in appeals is impacting operations - whether it be an increase in specific types of appeals, system and workflow issues regarding appeal filing, the sheer volume of appeals filed, or lack of agent involvement in the filing that may have resolved issues without the formal filing of an appeal. Our first step will be to take a quick and sober look at the number of changes and their impact on the appeals number, to determine where our best opportunities for improvement lie. After that, we will complete a full business process analysis with internal and external partners to find and fix issues that we identify. Throughout the process, we will be continually monitoring performance data to ensure our efforts are positively impacting those numbers.
Alternate Year Plan: ESD implemented a number of small scale process improvements during the period January 2017 - March 2018 that reduced average processing time lag from a high of 28 to 17 days, which was still not an acceptable level of performance. In March 2018 ESD held a large scale Lean event that resulted in a complete revamp of work flow and documentation of new standard work. This resulted in a dramatic decrease in the time from appeal request receipt to transmittal to OAH. As of June 2018, the turn around average was 4 days. A suggested technology improvement from the Lean event was implemented in July 2019. This automated appeal packaging submissions from UTAB directly to OAH with much less manual processing by staff and better standardization of appeal package contents, regardless of which ESD unit submits the appeal. We believe OAH should also experience processing efficiencies with greater standardization. As of August 2019, average turn around time from receipt of appeal request to transmittal to OAH was 2 days.
The next phase is to work jointly with OAH to determine the barriers they have that keep them from meeting timely targets. ESD has requested that OAH meet to begin this next phase of work, starting with a data review process and productivity statistics. Pending the outcome of this data review, ESD and OAH will identify next steps. As the steps are identified, ESD will work with OAH to assist in development and implementation of processes to increase performance within the Time Lapse ALP measure. As processes are implemented, ESD will conduct regularly scheduled meetings with OAH to ensure successes and improvement with the Time Lapse ALP. This will include adjustments as needed and continued follow up with ESD staff, vendors, and OAH staff.
C. If a plan was in place the previous year, explain why the actions taken in that plan were not successful in improving performance
Biennial Year Plan: We began this CAP in the alternate year of the last reporting period. Since then we have had technical assistance visits from USDOL staff, and completed several business process reviews to streamline appeals processes. However, much work remains between the multiple agencies involved to knock down the backlog.
Alternate Year Plan: We continue to work with our partners, including OAH, USDOL staff, and NASWA to streamline the appeals process. One of the biggest issues remaining is the ability to integrate the OAH system to ESD systems. This will allow direct communication and file uploads without agent intervention.
D. Brief description of plans for monitoring and assessing accomplishment of planned actions and for controlling quality after achieving performance goals
Biennial Year Plan: We continue to monitor in partnership with the Office of Administrative Hearings to ensure timely appeals.
Alternate Year Plan: N/A
Tax Quality -
A. Reason for the Deficiency
Biennial Year Plan: The Next Generation Tax System (NGTS) defects continue to be greatly affecting the generating of correct billing statements, processing employer tax reports and payments, and correctly applying payments received. These errors continue to contribute to samples failing in Report Processing, Contributory and Reimbursing Debits/Billings, Credits/Refunds, Employer Tax Rates and Collections during the 2017 TPS reviews. It was recommended in several areas that manuals be updated. Currently, all tax units are working with our Policy unit to update unit manuals and add standard operating procedures to the manuals. All manuals should be completed by June 2019, so all staff will have up to date manuals with one place to go to access procedures. We are continually reviewing our standard operating procedures and providing training to ensure we are properly processing document.
We are continually monitoring processes and when we identify system issues, a ticket is written when necessary. We have business representatives that work with IT weekly to address prioritization of tickets.
The Business Systems Manager is working with IPOne to get the delinquent tax reports filed and accounts inactivated when they no longer have payroll. The current schedule has reports filed by mid-2019.
Under Credit/Refunds a recommendation was made to consider revising a WAC. This has already been discussed with the Legal Appeals Unit and is in the process of being updated.
It was identified in the debits/billings section that there was an excess wage imbalance due to an incorrect SSN. When our new tax accounting system went live in 2014, we were not notifying employers when they had an excess wage imbalance. This ticket has since been deployed and we now are sending excess wage imbalance notification letter to employers when their tax report is posted. Also in this section a recommendation to address erroneous interest calculations. This is currently being worked on by our IT department. This issue should be fixed by first part of 2019.
A recommendation was made to do a comprehensive review of the entire test phase prior to mailing the annual tax rate notices. Annually staff work with IT to review accounts to ensure tax rate notices are accurate. Any defects identified before our IT department works to resolve. If there are any issues identified after run, ticket are written and address before the next years run.
Alternate Year Plan: N/A
B. Provide a description of the "Plan-Do-Check-Act" Corrective Action Plan
Biennial Year Plan: NGTS System defects have been continually monitored by the project’s business teams and steering committees, with bugs being logged, assigned, prioritized and corrected as quickly and effectively as possible.
We are continually monitoring processes and when we identify system issues, a ticket is written when necessary. There are different teams in our IT department that address issues in different functional areas. There is also a team dedicated to addressing billing issues. We have business representatives that meet twice weekly with IT to address prioritization of old and new tickets. The Business Systems Manager is working with IPOne to get the delinquent tax reports filed, payments and accounts inactivated when they no longer have wages to report.. The current schedule for IPOne to file delinquency reports and payments is mid-2019. We are currently in the process of reviewing all our standard operating procedures and manuals. This project is scheduled to be completed by June 2019. Line staff are involved in the updating of the standard operating procedures. As each procedure is updated, any training needs are addressed at that time. Our leads and supervisors are also spot checking staff work to identify any training needs.
Alternate Year Plan: N/A
C. If a plan was in place the previous year, explain why the actions taken in that plan were not successful in improving performance
Biennial Year Plan: This has been previously identified as a multi-year CAP. We have made some progress, as demonstrated by passing more samples this year than the year before. Strategic Response unit and the Account Management center made a push to get the “Post as Informational or Actual” queue caught up this past year. That backlog of work contributes to late account set ups. These are quarterly reports submitted with missing account numbers or the account is closed. Once staff contact the customer a new account has to be established or closed accounts have to be reinstated. Many of these actions could result in late Status determinations. This queue is now down from 2500 in October of 2017 to 98 today.
Alternate Year Plan: N/A
D. Brief description of plans for monitoring and assessing accomplishment of planned actions and for controlling quality after achieving performance goals
Biennial Year Plan: UI Tax managers continue to monitor performance statistics regularly and adjust resources as needed. Leadership monitors all activity through regular updates on the tax floor.
Alternate Year Plan: N/A
Improper Payments -
A. Reason for the Deficiency
Biennial Year Plan: N/A
Alternate Year Plan: The department rate for Q3 2018 was 19.59%. Specifically, ESD has additional policies surrounding work search activities that we believe contribute to the Improper Payment Rate being out of compliance. Work search issues account for 70.31% of our improper payment rate. With recent improvements to the state UI Benefits System, the job search reporting experience for claimants has changed, thus causing a difference in the way claimants are reporting job search activities via the IVR Telephone System versus the eServices online platform. Claimants are required to complete at least three job search activities per week to be eligible for benefits, however, it is not clearly displayed and communicated for claimants how to report/record their job search activities. There are also department-to-department differences in defining and approving job search activities. While our UI Benefits System has been stabilized, we continue to address remaining issues and seek further improvements.
B. Provide a description of the "Plan-Do-Check-Act" Corrective Action Plan
Biennial Year Plan: N/A
Alternate Year Plan: In early 2019 ESD began a large scale project focused specifically on Improper Payments that includes leadership from UI Claims, Policy, BAM, and Employment Connections. This project team has identified and targeted specific root causes to reduce the departments estimated rate of Improper Payments and meet the USDOL ALP by October 1, 2020. ESD is using a deliverable-based approach to identify staff responsible for each project component.
ESD has recently held several process improvement events to further drill down on each improper payment root cause, leading to additional and specific deliverables/milestones for each sub-project. This includes events for work search, benefit year earning and separations. During these events, we are conducting a deep dive into policy review, feedback from staff and claimants/employers, process changes and system improvements. The project groups for these sub-projects are also reviewing claimants materials and employee handbooks to find improvements and areas that are not clear to claimants and staff. As items are identified in the project groups, communications and policy teams are tasked with modifying current material, notices, and policies.
The project teams are reviewing current ESD policy add-ons concurrent with USDOL policies that will require changes to meet the desired model for reducing improper payments. A number of changes have been recommended by ESD leadership and policy staff, and we are in the process of revising work search policies to better support claimant understanding of ESD requirements for reporting approved activities. Current policies being revised include, approved work search activities to expand on what is currently considered acceptable, and how these activities are approved by each region; work search reviews being conducted sooner than 6 weeks after the initial claim is filed; leave of absence and standby procedures, notifying claimants when their standby status is ending so that they are aware that work-search activities will begin to commence in order to be eligible for further benefits. These policies have been identified by both ESD staff and NASWA staff as requiring an update in order to successfully meet USDOL ALPs by the intended target date of October 2020.
As we continue to maintain our project plan, we are committed to regular check-ins with project staff and executive leadership to ensure targets are met in a timely fashion and adjustments are made as necessary.
C. If a plan was in place the previous year, explain why the actions taken in that plan were not successful in improving performance
Biennial Year Plan: N/A
Alternate Year Plan: N/A
D. Brief description of plans for monitoring and assessing accomplishment of planned actions and for controlling quality after achieving performance goals
Biennial Year Plan: N/A
Alternate Year Plan: In the current CAP we have a major focus on Work Search, BYE, and Separation Issues, being that these account for 90.18% of the ESD's Improper Payment rate. ESD will continue to address the remaining identified root causes of Improper Payments as a next step to maintain USDOL performance standards. We have several project coordinators and change managers assigned to the Improper Payment project. As we work towards completing deliverables and improving performance, we will assess progress monthly based on USDOL's Improper Payment Rate ALP and adjust course as needed, ESD will implement an accountability system to target specific improper payment root causes while ensuring deliverable.milestone attainment and timely reporting to USDOL.
Detection of Overpayments -
A. Reason for the Deficiency
Biennial Year Plan: Washington’s results for detection of overpayments for the three year period ending 3/31/18 are higher than expected for federal review purposes because of its work search-related overpayments and how they interact with the federal performance formula. Washington has very strong work-search requirements in state law, mandating a progression to an “all weeks” review if the one week review uncovers eligibility or work-search errors. This results in a number of “all weeks” denials due to work-search errors, which create large overpayments.
The Benefit Accuracy Measurement (BAM) Operational Rate, the denominator of the overpayment detection ratio, excludes work search related overpayments. The numerator, overpayments established, includes work search related overpayments. Washington establishes a very high proportion of work search related overpayments in relation to total overpayments. Given the legal structure in Washington regarding work search overpayments, it is mathematically impossible for the state to meet the 95% acceptable level of performance for overpayments established to overpayments detected ratio by virtue of how the ratio is calculated.
Alternate Year Plan: As noted in the Biennial plan, a major driver of our deficiency is the inclusion of a large percentage of work search related overpayments. We are engaged in a systemic review of work search laws, policies and practices in an attempt to bring down the work search error rate. The CAP for Improper Payments addresses the projects for work search errors that are currently underway to improve the work search error rate that is currently at 70%, this will also have an effect on the detection of overpayments CAP. Work search errors are not coded as detectable with current procedures. Established overpayments do include work search errors. ESD is in the process of changing work search processes, policies, and weekly claiming processes to reduce work search related errors, but it is unclear if those changes would result in work search errors being deemed detectable or not. There is a possibility ESD is not currently reporting work search overpayments correctly.
B. Provide a description of the "Plan-Do-Check-Act" Corrective Action Plan
Biennial Year Plan: Washington is addressing work-search overpayments from a number of angles. We have built better tools in our new UI Benefits system to provide quicker visibility to work-search related errors on claims. These measures, partnered with expanded RESEA encounters and our existing work on cross-matches, should continue to bring the overall measure down toward the ALP. However, we may not ever be within the 50-95% parameter established due to our structural impediments.
There are also concerns that the combination of struggles in the BAM program and issues with Data Validation in certain benefits populations (see CAPs) may be affecting the underlying data to calculate the overpayment detection ratio. Washington will be continuing corrective actions in both these areas during the period, and will consider where there may be hidden effects on the ETA 227 data that require correction. These efforts will be tracked and reported through appropriate CAP milestones.
Alternate Year Plan: In early 2019, Washington began a large scale project focusing on Improper Payments. This project includes remodeling RESEA, building better tools in UTAB and analyzing work search errors, separations errors, and benefit year earnings errors. Washington will use this project plan to further drill down on areas of improvement. There are currently several requests to the policy unit to change current policies and laws which will better allow ESD to detect overpayments sooner. Some of the policies that are being reviewed include reviewing up front denials for self reported work search errors, rather than paying conditionally, requiring job search log entries upon weekly filing and better cross matching to reduce incidents of Benefit Year Earnings overpayments.
ESD will also do a root cause analysis of potential structural impediments, including analyzing the formula for overpayments established which does not include work search errors which is a very large portion of the overpayment rate. The BAM estimated overpayment rate is double what BPC reports for actual overpayments established, this will also be analyzed for discrepancies and errors in reporting. We have identified an addressed a training issue within BAM that resulted in an overpayment errors issue and ESD continues to maintain proper training for new staff and refresher training for existing staff to ensure overpayments are coded and recorded correctly.
The milestones in the CAP for detection of overpayments is being addressed in a project management format with regular check in's with management and leadership to ensure deliverable/milestones are on track for completion in a timely fashion. This includes regularly looking at data and how processes are completed to adjust procedures as needed to meet USDOL ALPs by October 2020.
C. If a plan was in place the previous year, explain why the actions taken in that plan were not successful in improving performance
Biennial Year Plan: N/A
Alternate Year Plan: The Improper Payments project plan that ESD implemented in early 2019 will allow management and staff to detect issues and errors sooner. The project team, management and leadership staff are dedicated to ensuring success of the project.
D. Brief description of plans for monitoring and assessing accomplishment of planned actions and for controlling quality after achieving performance goals
Biennial Year Plan: The UI Quality Assurance unit will be monitoring progress toward these goals in concert with the other CAPs, and improving communications with UI Operations staff to address these findings.
Alternate Year Plan: The Improper Payments project team and UI Quality Assurance team are working closely to ensure project success and completion including analyzing and reviewing data, policies, procedures, and staff training to ensure success.
Data Validation Benefits -
A. Reason for the Deficiency
Biennial Year Plan: As of 9-30-2017 Washington's new benefit system had several problem reports (Termed SQR's by our vendor) related to both federal reporting and benefit data validation populations. Our federal reporting and data validation teams worked extensively with agency business analysts assigned to the new system development effort and the vendor to correct these SQR's and new ones that were discovered in further testing. This effort required us to correct federal reports and recreate population extracts. We also had help from USDOL in December when several staff members visited us for a consultation visit in December 2017. We continued the testing and correction effort quarter January until final submission and were able to eliminate validation failures in all but three populations. (3, 3a, and 4 ) and 2 modules. Population 4 has since passed for quarter 1 of the new performance year. SQR's are still outstanding for the remainder.
Alternate Year Plan: N/A
B. Provide a description of the "Plan-Do-Check-Act" Corrective Action Plan
Biennial Year Plan: Washington will continue to work with our vendor to correct errors in the remaining populations. We believe population 3a is corrected. The issue was in system data and we won't be able to verify accuracy until we have a full quarter of data after the correction. (10-15-2018) The remaining issues require programming corrections and the corrections are in process. The corrections will be tested as they are completed. The effort level has been identified as larger. Washington would estimate a correction of data validation issues by 12-31-2018.
Alternate Year Plan: N/A
C. If a plan was in place the previous year, explain why the actions taken in that plan were not successful in improving performance
Biennial Year Plan: Washington greatly improved validation results and hopes to continue improvement.
Alternate Year Plan: N/A
D. Brief description of plans for monitoring and assessing accomplishment of planned actions and for controlling quality after achieving performance goals
Biennial Year Plan: Washington plans to monitor data and results from current and upcoming improvement events. Senior Management meet regularly to discuss ongoing issues and data validation is a regular topic in these meetings.
Alternate Year Plan: N/A
Data Validation Tax -
A. Reason for the Deficiency
Biennial Year Plan: Population 2 failed the Report Validation in timely and secured contributory reports because of defects in the electronic filing program having problems in downloading tax reports into NGTS. IT staff have to intervene to process the tax reports which have taken until the following quarter to do.
Population 3 failed the Report Validation in the "New <=90 days" count because the ETA 581 report is incorrectly counting future quarter liability dates.
Population 4 failed the Sample Validation because timely payments are being erroneously captured on the ETA 581 report in the established and liquidated counts, the tax system is not calculating removed amounts and balance amounts correctly.
Module 4 Status New failed because the differences in the count from both the ETA 581 report and TPS universe are including erroneous future liability dates and the TPS universe is also including predecessor/successor accounts.
Module 4 Successor failed because the differences in the count from both the ETA 581 report and TPS universe are including erroneous future liability dates
Alternate Year Plan: N/A
B. Provide a description of the "Plan-Do-Check-Act" Corrective Action Plan
Biennial Year Plan: Population 2 - To resolve the uploading problems which will correct the timely and secure counts, a new EAMS (electronic filing system) is currently being developed and is targeted to go live by the end of the year.
Population 3, Module 4 New and Module 4 Successor - IT is currently looking at both the ETA 581 and TPS universe to program them correctly and which will put them in sync with each other for Module 4 New and Successor. A target date for completion is 10/23/18.
Population 4 - As of July 2018, IT is reprogramming where needed in the accounts receivable field in 401 and business has start some testing for accuracy. No target date of completion has been established.
Lastly, a significant aspect of our difficulties with data validation comes with the specialized knowledge required to thoroughly identify and evaluate the errors we see. We intend to review our resources that we have available for data validation, and pursue knowledge transfer and training (informal and possibly formal) to bring more resources to bear on the issues we find. This will become especially important as we complete the transition to modernized UI systems.
Alternate Year Plan: N/A
C. If a plan was in place the previous year, explain why the actions taken in that plan were not successful in improving performance
Biennial Year Plan: We continue to work to fix the errors in our NGTS system, prioritizing errors that impact our customers ahead of internal issues.
Alternate Year Plan: N/A
D. Brief description of plans for monitoring and assessing accomplishment of planned actions and for controlling quality after achieving performance goals
Biennial Year Plan: Senior managers of the UICS, ESP and WITS divisions meet regularly to discuss status of major UI infrastructure projects. Reporting and data validation is a standard agenda items for these meetings. Additionally, senior agency leadership meet quarterly to review and prioritize all IT projects to balance the needs of the agency. These meetings discuss both large IT replacement projects as well as smaller, emergent IT needs to balance projects and priorities.
Alternate Year Plan: N/A
BAM -
A. Reason for the Deficiency
Biennial Year Plan: The selection process for BAM paid cases in the new UI Benefits system is not correctly tuned to match our overall claimant population.
Alternate Year Plan: Washington has struggled to meet the combination of case timeliness and case assignment over the past several years due to issues of headcount, personnel issues and staff classification. The Quality Assurance team has struggled in recent months with turnover of staff and training new team members. Two full time BAM investigators promoted to higher-paying positions earlier this year; and although those positions were filled, the training time for BAM staff to carry what is considered a full case load can take up to 12 months. Additionally, our Lead BAM Investigator promoted to a position outside the agency, leaving a gaping hole in our staffing structure. The remaining BAM investigators who are able to work a full case load have struggled to meet timeliness as their workload significantly increased. Given the substantial pressure on staff to complete the entire BAM caseload, the UI Quality Assurance Manager directed staff to concentrate on the 60 day timeliness and full case assignment, and that 90 day timeliness would be sacrificed to complete our required sample selection.
Additionally, ESD has continued to re-organize its management structures throughout UICS and PDPI which houses the QA/BAM unit, thus causing changes in roles and tasks of some of the staff. QA has absorbed additional tasks recently that have shifted focus for some of the staff within the unit.
Another contributing factor to the Timeliness issue is that QA had previously been advised that when additional information is needed on a BAM case, that one contact would be sufficient in establishing due process for closing a case. Recently, it was advised by USDOL that we should, in fact, be making three contacts when additional information is requested on a BAM case. This change in process has increased the time it takes to acquire all information to show due process and close the BAM cases, thus causing performance to decrease in this particular area. We are working to incorporate this new understanding into our regular work process.
B. Provide a description of the "Plan-Do-Check-Act" Corrective Action Plan
Biennial Year Plan: BAM staff are working with IT staff to identify and correct the errors in case selection algorithms to more closely match the claimant population. We are continuing to review to ensure that root causes are resolved with those fixes.
Alternate Year Plan: BAM has historically struggled with staffing due to funding and training times. As the agency continues to re-organize and re-classify staff to appropriate job classes, we are hopeful that his change will assist in acquiring new staff within the BAM unit. The QA unit has been working with the HR Department to reclassify the BAM and QA staff to better reflect actual job duties and responsibilities. These changes will be taking affect by the end of 2019 which will allow management to begin recruitment of the vacancies within the BAM unit.
We are also working to right-size the staffing to adequately staff all QA functions for the UI program. The UI Quality Assurance team currently has responsibility for BAM, BTQ, TPS, and the Benefits Self-Assessment, as well as the SQSP Process. This is beneficial in that it allows for significant cross-training and collaborative efforts between these programs, as well as a path for career development for staff. However, it is difficult to determine the proper staffing levels when combining all these programs into one team. We are still working to find that balance.
We continue to train staff using a variety of methods, including peer to peer reviews and training, lead staff training, adjudication training and other opportunities presented to us through partnering with NASWA and USDOL. The additional tasks and duties that have been recently assigned to QA are continuously evaluated for improvement and resource availability, including acquiring additional staff and funding to address the increased workload to the QA unit. We also recognize that there is a need for training to UICS staff in relation to what the BAM unit discovers during case review. Steps have begun to provide BAM 101 trainings and partnerships with UICS. At this time, presentations have been drafted, and the initial planning discussions have been had between QA and UICS. The effectiveness of the partnerships and the trainings will rely heavily on review of closed cases to ensure coding and procedures were properly met. We have one part time FTE dedicated to peer review and coding review at this time which has seen improvement of other areas of performance with both new and existing staff. We will continue to obtain guidance from USDOL and establish best practices and training opportunities for staff.
C. If a plan was in place the previous year, explain why the actions taken in that plan were not successful in improving performance
Biennial Year Plan: N/A
Alternate Year Plan: N/A
D. Brief description of plans for monitoring and assessing accomplishment of planned actions and for controlling quality after achieving performance goals
Biennial Year Plan: BAM staff will continue to monitor case selection characteristics to ensure continued compliance.
Alternate Year Plan: The UI Quality Assurance Manager is working with HR and budget to establish updated job descriptions and ensure appropriate funding is allocated as we fill current vacancies. Training for staff will be held on a more consistent schedule and internal peer reviews will be done regularly.
Facilitate Re-employment -
A. Reason for the Deficiency
Biennial Year Plan: Washington has not been required to complete a corrective action plan in the past for UI claimants' reemployment rates. We believe the drop in reemployment rates is due to two main factors. First, with Washington being near full employment, people experiencing longer term unemployment have greater barriers that the general population. Second, implementation of UTAB changed some business practices that deprived WorkSource offices of tools that encouraged engagement by UI claimants.
Alternate Year Plan: N/A
B. Provide a description of the "Plan-Do-Check-Act" Corrective Action Plan
Biennial Year Plan: ESD works diligently to closely integrate unemployment compensation and workforce services. The agency’s vision of UI benefits as a support bridge between jobs directly aligns with USDOL’s emphasis on claimant reemployment. Agency strategic plan success measures include reduced duration of UI claims and reduced time to find employment. The action plan includes working more successfully to meet employer needs, which will also result in better access to job opportunities for UI claimants and other WorkSource clients.
As reflected in our strategic plan, we are actively searching for additional ways to integrate our unemployment insurance program with labor exchange programs, and increasing visibility of UI in one-stop centers across the state. We have a strong Reemployment Services and Eligibility Assessments (RESEA) program centered in the one-stops, and are pursuing full integration of our new UI benefits and job-matching computer systems in one customer portal, in order to provide job-seekers with a seamless experience between their job search as they search for employment and their collect unemployment benefits. The portal is a long-term vision and the agency will focus on smaller steps to facilitate reemployment and integrate in-person customer service at one-stop offices with UI services offered via the Claims Centers. See the seven milestones listed below.
Alternate Year Plan: N/A
C. If a plan was in place the previous year, explain why the actions taken in that plan were not successful in improving performance
Biennial Year Plan: N/A
Alternate Year Plan: N/A
D. Brief description of plans for monitoring and assessing accomplishment of planned actions and for controlling quality after achieving performance goals
Biennial Year Plan: WA plans to use a series of events and review of current policies to assess how we are facilitating re-employment. WA had a site visit with NASWA August of 2018 and one of the biggest recommendations was for WA State to do more in the way of follow up with claimants and automatic scheduling for specific groups, specifically with RESEA. In order to increase RESEA initial appointment show rates from 62% to 80% by September 30, 2019 WA will submit a grant modification for our current RESEA grant, finalize business requirements and user stories, develop a software application which will include testing and staff training with a launch date of June 2019. WA will also be looking at practices that were used prior to UTAB implementation to generate call-in letters to selected claimants which will include criteria specific to the claimants area with in demand skills and those with individualized services. The bulk of the work will be contingent on policy review and legislative changes that can be accomplished within the 2019 Legislative session. This will also include pilot programs within local areas to conduct outreach campaigns and secure additional participants. WA plans to conduct these campaigns by reaching out to local businesses during August to November 2018 and tracking measures and outcomes in the following months. A claimant and Job seeker campaign will run from January to April 2019, again tracking measures and outcomes. We also discovered that we were not prioritizing follow up calls with RESEA claimants and in order to prioritize this function, we will be running a data exchange to determine if staff initiated contacts versus auto-calls will be a better option for improving this milestone. WA plans to launch this follow up program by January of 2019 after we have assessed a data plan and completed staff training.
Alternate Year Plan: N/A
IT Contingency Plan -
A. Reason for the Deficiency
Biennial Year Plan: N/A
Alternate Year Plan: The primary reason for the deficiency is related to staff turnover and ongoing leadership changes within ESD's Information Technology Services Division (ITSD). The managerial position defined as the "Owner"" of ESD's contingency plans, Disaster Recovery (DR) and Continuity of Operations (CoOP), has only recently been filled after having been vacant for 9+ months. There has also been significant turnover in other key IT leadership positions, including 4 CIOs in the last 13 months. ITSD is now stabilizing staffing and moving forward with a new leadership team.
B. Provide a description of the "Plan-Do-Check-Act" Corrective Action Plan
Biennial Year Plan: N/A
Alternate Year Plan: ESD recently secured legislative funding for an ITSD project to update the DR infrastructure, including creating a new DR site. This project will necessitate an in-depth review of all contingency processes and procedures, including incorporating the new infrastructure and determining the procedural and process changes needed as a result of the update.
As part of the new DR Infrastructure and Operations project, ITSD will work to review and revise all contingency plans by December 2019 based on a needs assessment for current and future states. Existing plans will be updated to the extent practical, and new plans will be drafted when necessary. During the same timeframe, ITSD will develop the plans and architecture for a new contingency plan infrastructure and recovery site.
ITSD will be planning for January 2020 internal/preliminary test of all contingency plans, conducting a table-top exercise. Unit-levels tests are anticipated by December 2020, but will take place in phases throughout 2020. A more formalized, cross-divisional testing of the new DR/CoOP infrastructure, plans and procedures is targeted for January 2021. By July 2021, ITSD anticipates having the DR/CoOP infrastructure fully implemented and tested across the agency, with a focus on the coverage and efficacy of the new infrastructure, plans and procedures.
The ITSD table-top exercises will serve as a check and initial shakeout of the DR/CoOP plans and procedures. The exercises will test the alignment between the draft plans and the current operational state, providing action items and lessons learned for moving forward with finalizing the plans. The later cross-divisional testing will engage agency executives, ITSD Operations and ITSD Information Security teams in conducting in-depth tests of the processes and procedures from beginning to end. These tests will finalize the contingency plans, and validate that action items have been addressed and lessons learned have been applied where appropriate.
C. If a plan was in place the previous year, explain why the actions taken in that plan were not successful in improving performance
Biennial Year Plan: N/A
Alternate Year Plan: N/A
D. Brief description of plans for monitoring and assessing accomplishment of planned actions and for controlling quality after achieving performance goals
Biennial Year Plan: N/A
Alternate Year Plan: Training plans are in place for new staff to ensure assurances are met in a timely fashion.